A Virtual Industry Day has not been scheduled. An update to this posting will be issued at a future date with registration information
The VA requires multiple indefinite-delivery, indefinite-quantity (IDIQ) Multiple Award Task Order Contract (MATOC) type contracts to provide construction services enterprise wide.
The objective of this procurement is to award multiple IDIQ MATOCs for construction services nationwide within specified pools. These pools will meet the VA infrastructure needs for construction, renovation, maintenance, and repair within the 50 United States and its territories.
The MATOC will consist of three (3) SDVOSB Pools with a minimum of ten (10) awardees each and one (1) National Unrestricted Pool with a minimum of ten (10) awardees. The SDVOSB Pools will be set-aside for Service-Disabled Veteran Owned Small Business.
Please see RFP, attachments, and appendices for further information.
The scope encompasses the full range of design, construction, and engineering activities necessary to meet the VA’s enterprise construction requirements across VHA Minor Construction Program, VHA Non-Recurring Maintenance Program, VA Major Construction Program, and VA Super Construction Program. Task orders will be executed through either Design-Build or Design-Bid-Build delivery methods. The contractor shall provide integrated design and construction services, maintain dedicated project management teams, implement quality control programs, provide construction scheduling, execute stakeholder coordination, maintain safety programs, implement infection control and interim life safety measures, coordinate furniture, fixtures, and equipment, and provide monthly progress reports. Work includes general healthcare facility construction and renovation, healthcare additions and upgrades, repairs and maintenance, parking structures, general office spaces, swing space, seismic retrofit, utilities, historic renovations, general infrastructure, sustainable infrastructure, medical equipment installation, technology infrastructure, and security infrastructure.
We post new general contractors opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20420""WASHINGTON""DC""USA""810 VERMONT AVENUE NW""36C10F27R0003.docx"133882"file"".docx""1""2026-11-04T18:45:09.763+00:00""4c23ac3a3f144a968d836bb317f063bd""public""0""public""5c5d4acbf05e4173a1a47222aab99656""0"100"0""Attachment_1 Draft DBnC Scope_20261104.docx"64216"file"".docx""1""2026-11-04T18:55:11.38+00:00""2e581d0f926f46e2b7eb4caed7c2efab""public""2026-11-05T14:35:35.969+00:00""1""public""05ef95e3a1c749e4b3f9c11b67edf821""0"98"0""2026-11-05T14:35:35.969+00:00""Attachment_1 DBnC Scope_20261104.docx"64216"file"".docx""1""2026-11-05T14:35:35.969+00:00""12619aa776bf49b08fca825694f9bbbc""public""0""public""5945db20082d4475a2c7d2dba5ccaabc""0"95"0""Attachment_2 DBnC_Ordering_Procedures 20261104.docx"39456"file"".docx""1""2026-11-04T18:55:11.38+00:00""a1a16a2d125045d3a5d83e60f175913a""public""0""public""af6a7787d8fc49628279c94cc8bbea1c""0"94"0""Attachment_3 Section_L Instructions_to_Offerors_20261104.docx"125635"file"".docx""1""2026-11-04T19:48:52.847+00:00""42072ef58bd74acebfbfa5062380c802""public""0""public""8e943841e7be4762accdc7a19fc576b3""0"88"0""Attachment_4 Section_M Evaluation_Criteria_20261104.docx"66542"file"".docx""1""2026-11-04T18:55:11.38+00:00""09ec33870016480b9a92e0a23344fd94""public""0""public""4a5eabe16c03492c9a4b1c05e7dc848e""0"87"0""Attachment_5 On_Off_Ramping_Procedures 20261104.docx"29044"file"".docx""1""2026-11-04T18:55:11.38+00:00""789bc8d0856b40599dfaea56fcc4d604""public""0""public""f64b19dad39648ba97b1d995af7ebd39""0"78"0""Appendix_L_01 Offeror_Company_Information 20261104.docx"31094"file"".docx""1""2026-11-04T18:55:11.38+00:00""a8b8522d54f642e8b882111bc261f59d""public""0""public""093adae7c94447359722ebbca14296f0""0"28"0""Appendix_L_02 Choice_of_Competition 20261104.docx"30146"file"".docx""1""2026-11-04T18:55:11.38+00:00""2c2487e7e58e4826bfc42fb0b5a44bb8""public""0""public""552b90360b00414cb42cc9414682528d""0"20"0""Appendix_L_03 Work_Sample_Cover_Sheet 20261104.docx"34424"file"".docx""1""2026-11-04T18:55:11.38+00:00""f72601dbf9e04175b2ddb1b011ddeb0e""public""0""public""3c0348dc49f9468f921fe9f8a211b8f3""0"18"0""Appendix_L_04 Cross Reference Matrix_20261104.docx"22316"file"".docx""1""2026-11-04T18:55:11.38+00:00""a6db3f0b95a54eb2bccc73ad8dcc2a27""public""0""public""970ddfb063084cfa948cf8c450c52285""0"16"0""Appendix_L_05 Self Scoring Matrix_20261104.xlsx"13273"file"".xlsx""1""2026-11-04T18:55:11.38+00:00""a45028eb813a42968ce1fab87bd27e17""public""0""public""290339166329440993807d487032cc0e""0"14"0""Appendix_L_06 Team Structure Format_20261104.docx"19305"file"".docx""1""2026-11-04T18:55:11.38+00:00""155c875e54ce4cc88c6c5c6421e1ed14""public""0""public""1ad826e63e644d8d832a8ec0bf91f994""0"12"0""Appendix_L_07 Pool Breakdown 20261104.docx"335715"file"".docx""1""2026-11-04T18:55:11.38+00:00""c6c37a4a352e483b8060553b0e26e136""public""0""public""136433d796eb45ed9347dc501f1e528d""0"10"0""Appendix_L_08_Price_Labor_Rates_20261104.xlsx"18258"file"".xlsx""1""2026-11-04T18:55:11.38+00:00""e2fe556c84964be8b5bf997416d217f9""public""0""public""7bddeb18c0bd4a118120a9ae7bf80e0d""0"8"0""Appendix_L_09 Small Business Participation Commitment Document SBPCD_20261104.pdf"600742"file"".pdf""1""2026-11-04T18:55:11.38+00:00""575003b50b964a99bdc0e91db236d610""public""0""public""13f0c057896f4d32b19739538a498a87""0"6"0""Appendix_L_10 Subcontracting Plan Template 20261104.docx"50389"file"".docx""1""2026-11-04T18:55:11.38+00:00""fed84589734f46369f0f0ade40986d0e""public""0""public""74e85c6aa068423db9e80229bb403f2d""0"4"0""Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx"43454"file"".docx""1""2026-11-04T18:55:11.38+00:00""34c6b85e35224ce99b3f4956a96057a4""public""0""public""5f382d606027417f8d3e864e6a0dbace""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 52c0e19768cb465ba977479fd76932bf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.