Currency Labels
The contractor will manufacture and deliver printed and blank pressure-sensitive labels for currency bundles and Cash-Paks. Printed labels include Old Currency Design (OCD), Next Generation (NXG) Design, and Currency CFD Design (CCD) bundle labels, as well as Solid Color (SC) and Diagonal solid (DD) color block Cash-Pak labels. Blank labels are intended for thermal transfer printing. The contractor must also supply Federal Reserve Bank (FRB) Eagle labels, test labels, and Zebra printer cartridges. Labels must meet detailed specifications for materials (adhesive, release liner, substrate opacity), performance (repositionability, tamper-evidence, bar code print quality), dimensions, color (Pantone®), and packaging. The contractor must provide a quality assurance system addressing ANSI/ISO/ASQ Q9001-2015, certifications, and test reports. Delivery is F.O.B. Destination to BEP's Eastern Currency Facility (DCF) in Washington, DC, Landover Warehouse in Landover, MD, or Western Currency Facility (WCF) in Fort Worth, TX, within 30 business days of a delivery order.
We post new goods & materials opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20228""WASHINGTON""DC""USA""14TH&C STREET, SW""Attachment A - Currency Labels Price Schedule.xlsx"13859"file"".xlsx""1""2026-10-29T18:15:47.349+00:00""73a1e5d1c114463295fd1b16138fc0d6""public""0""public""cffa5fad8bf94389bc81edde53c10db0""0"4"0""Question and Answer During Sources Sought 2031ZA26N00047 Posting.pdf"151777"file"".pdf""1""2026-10-29T18:15:47.349+00:00""9eb5712fe6284311a70a45e86d8b04b9""public""0""public""53923934687748a7a48c7f37d3c971cc""0"3"0""Solicitation 2031ZA27Q00005 Currency Labels.pdf"1757480"file"".pdf""1""2026-10-29T18:15:47.349+00:00""521cd12a9f7f4be59aec492796d7cb36""public""0""public""6f1bbaed08744cf497d429a5cbad8d16""0"2"0""2031ZA27Q00005 Solicitation-Synopsis Cover.pdf"212526"file"".pdf""1""2026-10-29T18:15:47.349+00:00""78f2fabd77a54449bedd4e9b2b1438ae""public""0""public""cffa1f5288dc4af1b35358142727af91""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 522e75c1e42c4865a7665b3ee470ab6e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.