***Amendment 0002 revises the solicitation to: (1) extend the Request for Information (RFI) deadline to December 14, 2026;
(2) revise SDVOSB bonding requirements; (3) clarify evaluation credit for Joint Venture members and formally documented
team members; (4) clarify Healthcare Facility experience requirements and concurrent project experience criteria; (5)
revise past performance evaluation to a Pass/Fail methodology and associated submission requirements; (6) revise MATOC
award and ceiling language; and (7) update task order competition procedures, including Rule of Two procedures. Affected Attachments and Appendices have been uploaded with tracked changes as necessary; previous/obsolete versions have been removed and replaced.***
The VA requires multiple indefinite-delivery, indefinite-quantity (IDIQ) Multiple Award Task Order Contract (MATOC) type contracts to provide construction services enterprise wide.
The objective of this procurement is to award multiple IDIQ MATOCs for construction services nationwide within specified pools. These pools will meet the VA infrastructure needs for construction, renovation, maintenance, and repair within the 50 United States and its territories.
The MATOC will consist of three (3) SDVOSB Pools with a minimum of ten (10) awardees each and one (1) National Unrestricted Pool with a minimum of ten (10) awardees. The SDVOSB Pools will be set-aside for Service-Disabled Veteran Owned Small Business.
Please see RFP, attachments, and appendices for further information.
The VA requires multiple indefinite-delivery, indefinite-quantity (IDIQ) Multiple Award Task Order Contract (MATOC) type contracts to provide construction services enterprise wide. The objective is to award multiple IDIQ MATOCs for construction services nationwide within specified pools. These pools will meet the VA infrastructure needs for construction, renovation, maintenance, and repair within the 50 United States and its territories. The MATOC will consist of three (3) SDVOSB Pools with a minimum of ten (10) awardees each and one (1) National Unrestricted Pool with a minimum of ten (10) awardees.
We post new general contractors opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20420""WASHINGTON""DC""USA""810 VERMONT AVENUE NW""36C10F27R0003_RFI_Tracker_Industry Version .xlsx"69478"file"".xlsx""1""2026-11-16T04:29:06.643+00:00""93ad8ab409d648f79e7e1ecbd00a8c13""public""0""public""9d74de0755a2472c8d5fb2340f4cf3fb""0"183"0""36C10F27R0003 0002.pdf"113144"file"".pdf""1""2026-11-24T13:48:07.406+00:00""acba5454ed9e4badb689460e084ab02b""public""0""public""ed1c86d2847444058b01f4863c60ce21""0"171"0""36C10F27R0003 0001.pdf"87233"file"".pdf""1""2026-11-16T04:29:06.643+00:00""a6efa3944bc144b0974aed0db9df7f2f""public""0""public""a10a05200dd84951af2e1c3e5cd2d70d""0"165"0""36C10F27R0003.docx"133882"file"".docx""1""2026-11-04T18:45:09.763+00:00""4c23ac3a3f144a968d836bb317f063bd""public""0""public""86c5a6df731d48cebdd72da4be10daf5""0"159"0""Attachment_1 DBnC Scope_20261104.docx"64216"file"".docx""1""2026-11-05T14:35:35.969+00:00""12619aa776bf49b08fca825694f9bbbc""public""2026-11-24T13:48:07.406+00:00""1""public""af9e4aa333224f008ef2ebe44f2c6a04""0"153"0""2026-11-24T13:48:07.406+00:00""Attachment_2 DBnC_Ordering_Procedures 20261104.docx"39456"file"".docx""1""2026-11-04T18:55:11.38+00:00""a1a16a2d125045d3a5d83e60f175913a""public""2026-11-24T13:48:07.406+00:00""1""public""3d2c3e02c46e481e994ccaaababeb85d""0"151"0""2026-11-24T13:48:07.406+00:00""Attachment_3 Section_L Instructions_to_Offerors_20261113_A01.docx"125546"file"".docx""1""2026-11-16T04:29:06.643+00:00""2b4bd87b0ad340dc978de542efb155b3""public""2026-11-24T13:48:07.406+00:00""1""public""bf6c8f14f626466aab376d72f24c793e""0"144"0""2026-11-24T13:48:07.406+00:00""Attachment_4 Section_M Evaluation_Criteria_20261104.docx"66542"file"".docx""1""2026-11-04T18:55:11.38+00:00""09ec33870016480b9a92e0a23344fd94""public""2026-11-24T13:48:07.406+00:00""1""public""c60d1ea470b146dc9589f8b0cc3a57b9""0"143"0""2026-11-24T13:48:07.406+00:00""Attachment_5 On_Off_Ramping_Procedures 20261104.docx"29044"file"".docx""1""2026-11-04T18:55:11.38+00:00""789bc8d0856b40599dfaea56fcc4d604""public""2026-11-24T13:48:07.406+00:00""1""public""b2c4df359d1647a68eb41cf21858bc74""0"134"0""2026-11-24T13:48:07.406+00:00""Attachment_1 DBnC Scope_20261123_tracked changes.docx"65799"file"".docx""1""2026-11-24T13:48:07.406+00:00""73ac4af2daa447d48b2c18295752916a""public""0""public""24bd4879ab4f4acdb76198990ddc9e3c""0"79"0""Attachment_2 DBnC_Ordering_Procedures 20261123_tracked changes.docx"41002"file"".docx""1""2026-11-24T13:48:07.406+00:00""ab657cfd07b940e0b4800c2ae0faac24""public""0""public""6de2c1bc86984c828b34445a987f33ac""0"73"0""Attachment_3 Section_L Instructions_to_Offerors_20261123_tracked changes.docx"134552"file"".docx""1""2026-11-24T13:48:07.406+00:00""b9c01feb680a444b9c74ca2f5ce8d467""public""0""public""3e58284c2d934fc7afc99592b0b9dee5""0"67"0""Attachment_4 Section_M Evaluation_Criteria_20261123_tracked changes.docx"69484"file"".docx""1""2026-11-24T13:48:07.406+00:00""c0d7ec367b4e4f4697315b78b18ce121""public""0""public""1b6e22e6842c4c8ea5bd1faf658bb7b9""0"61"0""Attachment_5 On_Off_Ramping_Procedures 20261123_tracked changes.docx"30268"file"".docx""1""2026-11-24T13:48:07.406+00:00""5e86501354af49628a439cfb55a06187""public""0""public""976b6c3d227140199c6466b2c148fbd7""0"55"0""Appendix_L_01 Offeror_Company_Information 20261104.docx"31094"file"".docx""1""2026-11-04T18:55:11.38+00:00""a8b8522d54f642e8b882111bc261f59d""public""0""public""753b084e2bb5420794dde55e0d6f6714""0"49"0""Appendix_L_02 Choice_of_Competition 20261104.docx"30146"file"".docx""1""2026-11-04T18:55:11.38+00:00""2c2487e7e58e4826bfc42fb0b5a44bb8""public""0""public""e3091573bc5545218d7284d2d27cbc32""0"36"0""Appendix_L_03 Work_Sample_Cover_Sheet 20261104.docx"34424"file"".docx""1""2026-11-04T18:55:11.38+00:00""f72601dbf9e04175b2ddb1b011ddeb0e""public""2026-11-24T13:48:07.406+00:00""1""public""04dd5a79d1b74364adddef3ee0e255a2""0"34"0""2026-11-24T13:48:07.406+00:00""Appendix_L_03 Work_Sample_Cover_Sheet 20261123_tracked changes.docx"36792"file"".docx""1""2026-11-24T13:48:07.406+00:00""2ade08b7ad884969a5a3def4d0703668""public""0""public""ad3aad0ee02e4f1795de3d7e383ea5fa""0"28"0""Appendix_L_04 Cross Reference Matrix_20261104.docx"22316"file"".docx""1""2026-11-04T18:55:11.38+00:00""a6db3f0b95a54eb2bccc73ad8dcc2a27""public""0""public""90f7e5c393b64e458027ff7f0d0a0edd""0"27"0""Appendix_L_05 Self Scoring Matrix_20261104.xlsx"13273"file"".xlsx""1""2026-11-04T18:55:11.38+00:00""a45028eb813a42968ce1fab87bd27e17""public""2026-11-24T13:48:07.406+00:00""1""public""53c82df0ae8642179b44b6495dd8e8bd""0"25"0""2026-11-24T13:48:07.406+00:00""Appendix_L_06 Team Structure Format_20261104.docx"19305"file"".docx""1""2026-11-04T18:55:11.38+00:00""155c875e54ce4cc88c6c5c6421e1ed14""public""2026-11-24T13:48:07.406+00:00""1""public""25d26e7e370b461694f4cb62d0f72783""0"23"0""2026-11-24T13:48:07.406+00:00""Appendix_L_05 Self Scoring Matrix_20261123.xlsx"15130"file"".xlsx""1""2026-11-24T13:48:07.406+00:00""61037166773c41b5897ded1a13f52e61""public""0""public""548149307c0e48eda355fb5a72f697a0""0"18"0""Appendix_L_06 Team Structure Format_20261123_tracked changes.docx"23134"file"".docx""1""2026-11-24T13:48:07.406+00:00""e6281254adb8487b81603b3484c8d6c4""public""0""public""300bca922a8a4e629bdaf74df60f344d""0"17"0""Appendix_L_07 Pool Breakdown 20261104.docx"335715"file"".docx""1""2026-11-04T18:55:11.38+00:00""c6c37a4a352e483b8060553b0e26e136""public""0""public""d3b3bbed451c4e3fa2f244ec09d44753""0"16"0""Appendix_L_08_Price_Labor_Rates_20261104.xlsx"18258"file"".xlsx""1""2026-11-04T18:55:11.38+00:00""e2fe556c84964be8b5bf997416d217f9""public""2026-11-24T13:48:07.406+00:00""1""public""e2f28ede66e6495f96656b4a1e081206""0"14"0""2026-11-24T13:48:07.406+00:00""Appendix_L_08_Price_Labor_Rates_20261123.xlsx"13417"file"".xlsx""1""2026-11-24T13:48:07.406+00:00""c415d92ed6044030ae7a4640ae1116c1""public""0""public""99e4f453602f4ce98e24c50494b27af2""0"10"0""Appendix_L_09 Small Business Participation Commitment Document SBPCD_20261104.pdf"600742"file"".pdf""1""2026-11-04T18:55:11.38+00:00""575003b50b964a99bdc0e91db236d610""public""0""public""5002e7be7ccc4389b4c5915b51b977be""0"9"0""Appendix_L_10 Subcontracting Plan Template 20261104.docx"50389"file"".docx""1""2026-11-04T18:55:11.38+00:00""fed84589734f46369f0f0ade40986d0e""public""0""public""2354e68d67ab4038b2db4f2c360760e2""0"6"0""Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx"43454"file"".docx""1""2026-11-04T18:55:11.38+00:00""34c6b85e35224ce99b3f4956a96057a4""public""2026-11-24T13:48:07.406+00:00""1""public""cf6e9422937f4126a7829642e967b838""0"4"0""2026-11-24T13:48:07.406+00:00""Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261123.docx"43579"file"".docx""1""2026-11-24T13:48:07.406+00:00""cb1143d91ba84524a86305aff720765f""public""0""public""4917dd207cc645dc87e9db580d4aa912""0"3"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 50c4c2b25d464578b63d996a3ad96e9f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.