This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 12444727Q0004 is issued as a Request for Quotation (RFQ). The USDA Forest Service, Southern Research Station, requires a qualified hazardous-waste contractor to perform a one-time removal of chemical waste from its closing laboratory in Stoneville, Mississippi. The contractor will provide all labor, packaging materials, approved containers, equipment, manifests, and transportation needed to safely package, load, stabilize as required, and transport the waste to an authorized treatment, storage, or disposal facility, including incineration as applicable. The contractor must provide a final inventory, signed transportation manifests, and documentation confirming final treatment or disposal.
This acquisition is set aside for small business concerns. The applicable North American Industry Classification System (NAICS) code is 562211—Hazardous Waste Treatment and Disposal. The small business size standard is $47 million. This acquisition is a total small business set-aside. All responsible small business concerns may submit a quotation, which the agency will consider.
Amendment 0002 Notice
Solicitation Number: 12444727Q0004
Title: Hazardous Waste Treatment and Disposal Services, Stoneville, MS
Purpose of Amendment
The Government is issuing this amendment to correct an administrative error in the solicitation.
FAR 52.219-14, Limitations on Subcontracting, is hereby removed from the solicitation in its entirety. Offerors shall disregard this clause when preparing and submitting quotations.
The Period of Performance is hereby revised as follows:
Previous Period of Performance: 11/30/2026-12/30/2026
Revised Period of Performance:
December 1, 2026 through December 18, 2026
All references in the solicitation to the previous Period of Performance are amended accordingly.
The quotation submission deadline is extended as follows:
Previous Due Date: 11/19/2026 11:59PM EST
New Due Date:
November 25, 2026, at 11:59 PM Eastern Standard Time (EST)
Quotations received after this date and time may not be considered for award.
Except as modified herein, all other terms, conditions, provisions, and requirements of the solicitation remain unchanged and in full force and effect.
Offerors shall acknowledge receipt of this amendment with their quotation submission
The contractor shall furnish all labor, trained personnel, equipment, approved containers, packing materials, labels, vehicles, and documentation necessary to complete the work safely and in accordance with all applicable federal, state, and local environmental and hazardous-materials transportation requirements. Services shall include on-site packing and loading; stabilization or temperature-controlled handling where required; transportation to an authorized treatment, storage, or disposal facility, including incineration as applicable; an inventory of removed waste; completed and signed hazardous-waste and DOT manifests; and final written certification of treatment or disposal.
We post new uncategorized opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""Z01 Stoneville_QA_ -2.pdf"171951"file"".pdf""1""2026-11-19T19:15:13.741+00:00""d070c099d8c347b5b37a90579d91869e""public""0""public""b01484f8ce7f4222aa0dbc1845d98fb3""0"13"0""C04_CombinedSS_12444727Q0004 final 2.pdf"278107"file"".pdf""1""2026-11-19T19:15:13.741+00:00""2a6006b9b43f4cd3be1886065b3131b1""public""0""public""edaebc4ba85b4f0ebe52178ea43c7d56""0"12"0""C05 12444727Q0004 Amendment 2.pdf"94750"file"".pdf""1""2026-11-19T19:15:13.741+00:00""80ff5b4a0a0741579aef41cbd1f6a97d""public""0""public""070871810bb747a9be9e10995885d0a4""0"11"0""Stoneville_QA_.pdf"167365"file"".pdf""1""2026-11-13T17:48:23.264+00:00""41de5c3009074e9f948f450902ed477f""public""0""public""5764fa0db4f84d81982e80bf939de4a2""0"10"0""C05 12444727Q0004 Amendment.pdf"91931"file"".pdf""1""2026-11-13T16:49:01.041+00:00""14f848f58d1f4edb9a2d790b21a5dd7b""public""0""public""fe188c4256c745dda363532312155622""0"9"0""uranyl acetate.JPG"11256876"file"".jpg""1""2026-11-09T21:19:20.927+00:00""c82581a54d03438ca125be972d3e3438""public""0""public""008149f5a3da4e99a13665e346f2a726""0"8"0""chemical pictures.zip"29375268"file"".zip""1""2026-11-09T21:19:20.927+00:00""0d1f2e6be05b49c4aed98b5d9fd5be46""public""0""public""b2b2c74e672841018f01b03e7f8c2a0b""0"7"0""C04 SF 1449 12444727Q0004.pdf"354811"file"".pdf""1""2026-11-05T19:36:45.074+00:00""8f2b0b6d96c044e0813d6690420aa307""public""0""public""3e87d19123e04a5787c9aef51fd6a509""0"5"0""C04 Attachment 2 _Schedule_of_Items_.pdf"98654"file"".pdf""1""2026-11-05T19:36:45.074+00:00""75f85e0ce5fe4f48979cfee9468eeb73""public""0""public""8c65f989a0824854b7dcc90d39094e6f""0"4"0""C04 Attachment 1 Final SOW.pdf"238941"file"".pdf""1""2026-11-05T19:36:45.074+00:00""6ac741910dd84194a7d0148da8f030a4""public""0""public""cca18d7015d04e4a804e094e929ada45""0"3"0""C04 Attachment 3 WD 2015 5161 REV 34 082226.pdf"69875"file"".pdf""1""2026-11-05T19:36:45.074+00:00""86709df8b44d4e748b8d49ea951a945d""public""0""public""2b8988a545b44d1b9cbcbc40222fe91b""0"2"0""C04_CombinedSS_12444727Q0004 final 2.pdf"252184"file"".pdf""1""2026-11-05T19:36:45.074+00:00""ad3d8e5d708e47adae16a5b420e9d4b4""public""2026-11-19T19:15:13.741+00:00""1""public""31a2133aa7f540f394158cdf72b06002""0"1"0""2026-11-19T19:15:13.741+00:00"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4b3e6a5801b1437a8985d124e2251d80), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.