Portsmouth Naval Shipyard (PNSY) is seeking to lease one electric powered Low Pressure Air Compressor (LPAC) in accordance with the Statement of Work (SOW). The applications are for establishing a Tool Air system.
Please review the attached SOW and Request for Quote (RFQ). Please return a completed RFQ with all required fields filled in as well as any supporting technical information (tech spec sheet, brochure etc).
All submission must be emailed and received prior to the deadline specified on the RFQ. Please email William (Bill) LeDuc with any questions at william.v.leduciii.civ@us.navy.mil.
The contractor must supply, deliver, set up, and maintain a single integrated 100 HP electric LPAC (400 CFM, 125 PSIG) with a 500-gallon ASME-rated air receiver, 400 CFM desiccant air dryer, distribution manifold with four branch outputs, and 250 ft of 3-inch air hose with safety restraint devices. The unit must be weatherproof, for outdoor use, with a Remote Emergency Stop (E-stop) switch. The contractor must perform start-up and commissioning, provide preventative maintenance and weekly inspections, supply all consumables (oil, filters, coolant, lubricant), and provide training to Shipyard personnel. The contractor must also deliver technical documentation including maintenance plans, service reports, and operating instructions. Repair service must be within 12 hours, with a replacement within 24 hours if the unit cannot be returned to service. The work is performed at Naval Submarine Base New London, Groton, CT, and the initial period of performance is 4 weeks from 12/01/2026 to 12/28/2026 with a 2-week option.
We post new real estate & leasing opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"03801-5000""PORTSMOUTH""NH""USA""PORTSMOUTH NH 03801-5000""Exhibit A_Redacted.pdf"860605"file"".pdf""1""2026-10-28T16:18:45.687+00:00""ca413c1eee884d8f8b67bd3f16994b1a""public""0""public""60c603a503af4eba869f596903a43a7d""0"6"0""Attachment 3- OPSEC Encl 2_Redacted.pdf"881223"file"".pdf""1""2026-10-28T16:18:45.687+00:00""49362ec41b4b4e0499afcbb3447b1415""public""0""public""c8db9af351ce4bda98cce78a7779a918""0"5"0""Exhibit B_Redacted.pdf"850544"file"".pdf""1""2026-10-28T16:18:45.687+00:00""27d261bc7a1c49d290a8a7c21f85bf8d""public""0""public""c46a22b14ac947b4aac7b93568d2fab4""0"4"0""Attachment 1- Statement of Work (SOW).pdf"853210"file"".pdf""1""2026-10-28T16:18:45.687+00:00""7deb2b9b30224ab1a60ec50ff781f66c""public""0""public""4640733851be4f9fb47b8fe1af3cf5b4""0"3"0""N3904027Q3208 Request for Quote.pdf"847056"file"".pdf""1""2026-10-28T16:18:45.687+00:00""097b070a55e74f2cb63eba423a5dc5a1""public""0""public""e4834e482e524693b4ade514d6d4b908""0"2"0""Attachment 2- General Specs for ILA Design.pdf"174164"file"".pdf""1""2026-10-28T16:18:45.687+00:00""ad019935ad3e4926bd4bedfda5034649""public""0""public""5f330a4aa30d46f6bf088124b296bca7""0"1"0"Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 488a3d0c1c134cdbbd08d73f393c71c7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.