We post new asphalt opportunities in Wyoming as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Update 07/24/2026: QandA_07-24-2026 and updated project discription posted to attachments.
Update 07/06/2026: QandA_07-06-2026.pdf posted to attachments.
NOTICE OF SUBCONTRACTING OPPORTUNITY
This Work consists of constructing a two-lane, temporary traffic bridge and detour, bridge removal, installation of riprap scour protection, bridge construction, stone masonry, geotechnical ground improvements, parking area improvements, approach road reconstruction
This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.
Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton
Project Location: Approximately 7 Miles E of West Yellowstone, MT.
Project Length: 0.36 Miles
**Estimated Price Range: **$20,000,000.00 to $30,000,000.00
Tentative Solicitation Date: Fall 2027 - Winter 2028
Tentative Fixed Completion Date: Fall 2030
**INTERESTED VENDORS LIST: To view the Interested Vendors List, **you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
Contractor Information on the IDIQ contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the **REQUEST FOR PROPOSAL **(specifications and plans) will be posted at this link.
The work consists of constructing a two-lane, temporary traffic bridge and detour, bridge removal, installation of riprap scour protection, bridge construction, stone masonry, geotechnical ground improvements, parking area improvements, approach road reconstruction. Specific line items include 3.8 ACRE of clearing and grubbing, 10,000 CUYD of excavation and embankment, 1,170 CUYD of riprap, 3,200 SQFT of reinforced concrete retaining walls, 3,000 TON of asphalt concrete pavement, 1,600 LNFT of driven piles, 874 CUYD of structural concrete, 195,000 LBS of reinforcing steel, 490,000 LBS of steel structures, 490 LNFT of bridge railing, 1 LPSM of temporary works – work access bridge, 5 EACH of bearing devices, 1 LPSM of minor bridge work – detour traffic bridge, 75 LNFT of culverts and drains, 2,295 LNFT of curb and gutter, 1,923 SQYD of sidewalks, pads and paved medians, 356 SQYD of stone masonry, 4.5 ACRE of topsoil and turf establishment, 6,000 HR of temporary traffic control – flagger, and 1 EACH of vault toilet.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""QandA_07-24-2026.pdf"182607"file"".pdf""1""2026-07-24T19:23:31.161+00:00""04b1fd2b788d42ff8cbd5dccf806a973""public""0""public""102e80c4d7b94753881fd06de3c0be19""0"6"0""Project Description_WY NP YELL 15(2) Madison River Bridge .pdf"315090"file"".pdf""1""2026-07-24T19:23:31.161+00:00""c6ab462635194236a2639d3148bcd526""public""0""public""f39d7de4296b4e86964d5190b7cda539""0"5"0""QandA_07-06-2026.pdf"177065"file"".pdf""1""2026-07-06T14:33:26.45+00:00""3e3dc6e8595b4d078a200690eb67b4f5""public""0""public""35bdbfa1ab124aae9595a64e211e775e""0"4"0""Prelim Letter_WY NP YELL 15(2) Madison River Bridge.pdf"192981"file"".pdf""1""2026-07-02T20:31:58.783+00:00""378c0f212f924bae9e0c994b59510566""public""0""public""5d10e68469b74accae59c9f2e19b8e16""0"2"0""Prelim Plans_yell01502.pdf"51286668"file"".pdf""1""2026-07-02T20:31:58.783+00:00""1ae00ceef3ea4c9baae745ac70d68aae""public""0""public""ec315313a78145338e713317026f8d08""0"1"0""https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton""Link to MATOC information"0"link""1""2026-07-28T18:03:59.757+00:00""8118c3b10b5745beba8df56ad02f6d29""public""0""Link to MATOC information""public""43c75735a225483faee5da9f7f0811ed""0"1"0"Source: SAM.gov (notice 46491d976350407b955d4df628929879), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.