UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Fabrication, Instrumentation and Inspection Division at ORNL is in need of an DSS Ring Lock Scaffolding System or equivalent. Please reference Attachment C- RFQ519648 Bill of Materials for product specifications.
Attachments:
RFQ519648
Attachment A- Terms and Conditions Purchase Order Commercial Products and Services
Attachment B- Prime Flowdown Clauses
Attachment C- RFQ519648 Bill of Materials
Attachment D- Reps and Certs Abbreviated
The bidder must supply a DSS Ring Lock Scaffolding System or equivalent, including items such as adjustable bases, braces, coupling pins, frames, guard posts, standards, and planks as listed in the Bill of Materials. The system must be fully compatible with existing DSS Uni-Lock ring-lock scaffold components, comply with OSHA and applicable industry standards, and be delivered with required certifications including third-party manufacturing certification, fall protection anchor point certification, and a certificate of conformance.
We post new goods & materials opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""37831""Oak Ridge""TN""USA""Oak Ridge National Laboratory""PO Box 2008""Attachment A - Terms-Conditions-Purchase-Order-Commercial-Products-Services-BSD-CS-2154-09.30.2026.pdf"270213"file"".pdf""1""2026-11-17T21:12:42.894+00:00""ec1ecdf7f28248f2b148ad7f50914f5c""public""0""public""69d8e9c1b9ab4e028c0b11edf5407d5d""0"5"0""Attachment B - Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf"297899"file"".pdf""1""2026-11-17T21:12:42.894+00:00""ef2517f2b77948a3aad4ba017d7e0ed1""public""0""public""e2ea5a3444f040518bc79d4da3715c07""0"4"0""Attachment C - Reps-and-Certs-Abbreviated - 2026.03.09.pdf"987929"file"".pdf""1""2026-11-17T21:12:42.894+00:00""eb57839a843440d08abe783133756631""public""0""public""f43d09e20d3343788e71454d3501384c""0"3"0""Attachment D - Bill of Materials.pdf"81234"file"".pdf""1""2026-11-17T21:12:42.894+00:00""84bc748ce5a641bca608d1bb25f0de89""public""0""public""53a88574ed0e447c9cf9046ea02e116e""0"2"0""RFQ519648.pdf"239882"file"".pdf""1""2026-11-17T21:12:42.894+00:00""7e20207a60a14230b19daa17858ec1be""public""0""public""d4fcb65e1904461ea055a4f643cb582d""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4608ca48dfac47a29f501492d53ae4d3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.