Cross Connection Hazard Assessment for DLA Distribution San Joaquin, CA
***** Amendment 0001 *****
The contractor shall conduct a comprehensive initial cross-connection hazard assessment of the potable water system at the Defense Distribution San Joaquin (DDJC) facility in Tracy, California. This includes a physical survey of the single groundwater source, on-site pumping and treatment facilities, an elevated potable-water storage tank, the campus-wide water distribution system, and the interior and exterior of all 43 served buildings. The contractor must identify and classify all existing or potential cross-connections, inspect all currently installed backflow prevention devices to determine their type, condition, and code compliance, and recommend corrective actions such as specifying the type of backflow prevention assembly required. The contractor shall provide a comprehensive inventory database, a draft assessment report, and a final assessment report incorporating government comments.
We post new plumbing opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"17070-5008""NEW CUMBERLAND""PA""USA""ACQUISITION OPERATIONS (J7)""430 MIFFLIN AVENUE SUITE 3102A""SP330027Q0011 - Amendment 0001.pdf"243776"file"".pdf""1""2026-11-16T18:42:02.227+00:00""024fd904cbc44709b5a2aae00816f38d""public""0""public""6f05f0fb9891486db9b5c93843cd21d9""0"8"0""SP3300-27-Q-0011 - Amendment 0001.docx"47913"file"".docx""1""2026-11-16T18:42:02.227+00:00""791a627afa1940e69d1c62d8092ae2ef""public""0""public""62f0b4df500d498e9e9786422ca6c322""0"7"0""Attachment 4 - Deliverables Schedule.docx"14715"file"".docx""1""2026-11-16T18:42:02.227+00:00""fa986f8e4db54e4b8bded163f9a5ee93""public""0""public""7b92ae947fc3437bab1e7737232dce98""0"6"0""Attachment 3 - Wage Determination 2015-5653.pdf"69804"file"".pdf""1""2026-11-16T18:42:02.227+00:00""9ef0e52233f94542a7442446d3c510c1""public""0""public""6247cb2f48c34872ab4e8aed2dc32a17""0"5"0""Attachment 2 - Performance Work Statement.docx"18638"file"".docx""1""2026-11-16T18:42:02.227+00:00""52d75086e02b4c7b8532279825ea1abb""public""0""public""18d207b0e1e844dbbf4833279efae2a1""0"4"0""Attachment 1 - Schedule of Supplies or Services and Prices.xlsx"15617"file"".xlsx""1""2026-11-16T18:42:02.227+00:00""a4ed4dd6cce94ccf990c0b8907658bb6""public""0""public""e28b82c40544437681acbee293c76129""0"3"0""Tab A-3 PWS_Cross_Connection_Haz_Assesment.docx"18416"file"".docx""1""2026-11-06T17:15:08.405+00:00""dd046d40c1474bb682370c2548d9b0d5""public""2026-11-16T18:42:02.227+00:00""1""public""a540c40e5eee47fab45872ceb7ab6195""0"2"0""2026-11-16T18:42:02.227+00:00""SP330027Q0011.pdf"78384"file"".pdf""1""2026-11-06T17:15:08.405+00:00""9b8a6723e8c74dcc82371d6d991e28ca""public""0""public""30041808479d43009407951e1d25345d""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 45066985ccdb460a8380113ba1f54d04), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.