We'll email you new asphalt opportunities in Washington as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Invitation for Bids (IFB) for Construction Project, WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
The IFB, plans, and physical data are posted under Attachments/Links.
Note: This project is being advertised as Full and Open
INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
The work includes mobilization, construction survey and staking, contractor quality control and testing, construction scheduling, soil erosion control with fiber rolls, clearing and grubbing, boulder placement, placed riprap (Class 4 and 5), dump truck and hydraulic excavator rental, general labor, turf establishment, mulching, plantings, temporary stream diversion, rolled erosion control product, temporary traffic control (including tubular markers, drums, warning lights, pavement markings, signs, flaggers, and a traffic control supervisor), environmental design root wads, and bank stabilization with engineered log jams and dolosse-textured elements. The project has two schedules (A and B) with similar line items. At Site 107 MP 0.8, work includes an engineered log jam (ELJ) with dolosse, riprap protection, and planting. At Site 107 MP 0.3 to 0.5, work includes bank stabilization with root wads, boulders, and riprap.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""IFB_69056727B000002.pdf"20950016"file"".pdf""1""2026-10-30T22:29:34.658+00:00""7f123f9d6c5b465dae5ea719b74637fa""public""0""public""cce6ab64e338437cb754f2d41c1f1599""0"3"0""wa-ep-olym2022-1-3_plans_IFB.pdf"33121565"file"".pdf""1""2026-10-30T22:29:34.658+00:00""851a02b0160b4b3c9b98d736b6da4f54""public""0""public""1bd84b27eb6e46269188415b8b7d6cc2""0"2"0""Physical Data_WA ERFO NPS OLYM 2022-1(3).zip"20769909"file"".zip""1""2026-10-30T22:29:34.658+00:00""9afdcbb591fb4135a3438ef7973a13b7""public""0""public""4d21349b8510441e875d774ef20c9539""0"1"0""https://meet.google.com/meet/eee-eieo-sdh?authuser=0""Online bid opening link"0"link""1""2026-10-30T22:29:34.658+00:00""71c07f9c93694f5684126982d3d4b27a""public""0""Online bid opening link""public""fd5b1ac25a454b5389868ce175d970ec""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 44caee7ff3bd4c4dbe7d15681eda8830), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.