The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) intends to award Firm Fixed Price contract for a towed array transporter and dockside handling system in accordance with The Towed Array Transporter and Dockside Handling System Technical Requirements Package. See Combined solicitation/synopsis for additional information.
Provide a towable 4-wheel reel handler/transporter limited to 8ft 6in by 9ft 6in by 16ft for a 7,000-lb load within 12,000-lb gross trailer weight, with highway brakes, lighting, hitch, steerable forward axle, 4-point leveling, overhead lift features, generator stowage, NEMA power distribution, storage and task lighting. Provide reeling for a 60-in hub / 87-in flange / 68-in reel with turret, 0-15 RPM, 0-650-lb back tension, emergency stop, transport interlock and telescoping chute on 240VAC single-phase power. Build for marine salt-spray exposure with corrosion-resistant coatings, drainage, 20-year service life with COTS parts, technical manual and spares, plus maintenance plan, technical data package and CDRL data as ordered.
We post new goods & materials opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"02841-1703""NEWPORT""RI""USA""1176 HOWELL ST""I.G (U) Reel HandlerTransporter System Requirements_v6.pdf"146054"file"".pdf""1""2026-10-05T19:25:57.832+00:00""c2293aeed67d41ceac25a80063648be1""public""0""public""1b071bf089cc4d2fabe16c74e03f9cdd""0"5"0""N6660426Q03070001.pdf"182627"file"".pdf""1""2026-10-05T19:25:57.832+00:00""e768d0be55064f9499ea9688aaddd98b""public""0""public""ca74f1c521da4ca2837d8805038194f5""0"4"0""20260803 - TDP Option Selection Worksheet (CLB Dockside Handler).pdf"273013"file"".pdf""1""2026-08-28T14:44:08.13+00:00""26d92c611aa44e94bccd5e7d5bb380b6""public""0""public""c942dc721ac0484d860b83acd9e826ec""0"3"0""Contract Data Requirements List_Redacted.pdf"126984"file"".pdf""1""2026-08-28T14:44:08.13+00:00""79595cc3b6b84f6daa14f1e363430947""public""0""public""cf6ac58c099d4265ab5bad527473b185""0"2"0""N6660426Q0307.pdf"208093"file"".pdf""1""2026-08-28T14:44:08.13+00:00""26ac573b434c47aaa8c849634c786c8f""public""0""public""f170172c838f498da4a8ad73baec8fff""0"1"0"Most Rhode Island work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 44bfa8cc06ff458b8df264e818da1e3a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.