The purpose of this requirement is to replace two (2) rusted vertical frame pieces and one (1) horizontal brace of the original gate valve assembly. Work requires temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications. Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure.
The contractor shall provide all logistics, labor, tools, and the lawful disposal of all materials and removed components IAW Attachment 1, Statement of Work, Dated 01 Sep 2026.
The work involves temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications. Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure. The contractor shall provide all logistics, labor, tools, and the lawful disposal of all materials and removed components.
We post new goods & materials opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"71110-2438""BARKSDALE AFB""LA""USA""CP 318 456 6840""801 KENNEY AVE BLDG 4400""Combined Synopsis Solicitation - FA4608QS053.pdf"311233"file"".pdf""1""2026-11-17T19:23:20.368+00:00""a759af62d75345fe9552d2334f8fb8b4""public""0""public""415dbff133dd4ea8b324586f74836210""0"3"0""Attachment 1 - Statement of Work.pdf"1391489"file"".pdf""1""2026-11-17T19:23:20.368+00:00""bdd5ae62137d482fba2be1c5fe8cc826""public""0""public""c4c9691a28de4bc8b4b9b840dd38e59c""0"2"0""Attachment 2 - Wage Determination.pdf"678750"file"".pdf""1""2026-11-17T19:23:20.368+00:00""25f8798ed95c4c27bae3e83784d0dc26""public""0""public""f5a725915ca94560ae3d5c08f59f1bd8""0"1"0"Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 41f0b52070004c738ea8d1828b2d46ab), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.