The Contractor shall provide all labor, materials, OEM replacement filters, tools, test equipment, and qualified service personnel to perform replacement of STERIS Clean Flow Pro steam filters and calibration of associated equipment at the VA San Antonio Healthcare System (Audie L. Murphy VA Medical Center), San Antonio, TX, and the Kerrville VA Medical Center, Kerrville, TX, in accordance with the Statement of Work (SOW).
The contractor shall provide all labor, materials, OEM replacement filters, tools, test equipment, and qualified service personnel to perform replacement of STERIS Clean Flow Pro steam filters and calibration of associated equipment at the VA San Antonio Healthcare System (Audie L. Murphy VA Medical Center), San Antonio, TX, and the Kerrville VA Medical Center, Kerrville, TX, in accordance with the Statement of Work (SOW). Equipment shall be calibrated to OEM standards after installation. The filters being replaced are listed by serial number at each location. All services must be performed in conformance with the Code of Federal Regulations Part 21, National Fire Protection Agency (NFPA), Occupational Safety and Health Administration (OSHA), and Original Equipment Manufacturer standards and specifications.
We post new equipment maintenance & rental opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""36C25727Q0071 0002.docx"116226"file"".docx""1""2026-11-18T16:32:38.582+00:00""bdce42af98a9488e83061cee40d55356""public""0""public""e79c8d278eaf4e6aa2454f35f3c8f242""0"6"0""36C25727Q0071 0001.docx"116011"file"".docx""1""2026-11-12T23:30:13.859+00:00""fb40dcded10f48b79e632d672f24dceb""public""0""public""50cfaf9fd35442f4a30f5658a11d2200""0"5"0""S02_36C25727Q0071.pdf"698757"file"".pdf""1""2026-11-03T16:02:27.069+00:00""eb86729ff7a74579a1f1632366392f08""public""0""public""e499623411404131bb1e7b47de507354""0"4"0""D.1_WAGE DETERMINATION 2015-5253.pdf"257810"file"".pdf""1""2026-11-03T16:02:27.069+00:00""24f9ae4c3d6b49f28f3de54636d57080""public""0""public""ce9193becaac4b68a79375d386aa8194""0"3"0""D.2_WAGE DETERMINATION 2015-5293.pdf"257854"file"".pdf""1""2026-11-03T16:02:27.069+00:00""5908b9ec243f4d47b01488cc1f7a0929""public""0""public""b2aab24895a247829141b3b7971d4c49""0"2"0""D.3_PAST PERFORMANCE REFERENCES.pdf"133637"file"".pdf""1""2026-11-03T16:02:27.069+00:00""119f9cb09709417e87a4b3aac46c3ae4""public""0""public""923e2007b9654f4387eafee5fb094378""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 41e3474639ee4fd2a6c76da29bdf2198), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.