Hanscom AFB requires temporary wastewater hauling capabilities to prevent sanitary sewer overflows (SSOs), maintain environmental compliance, and support operational continuity during lift station pump failure, replacement. The objective is to main tain wet well liquid levels at safe operating thresholds continuously until primary pumping system is restored.
Please see the attached PWS and Cover Letter for more information.
Amendment 1: Re-uploaded PWS for easier access
The contractor shall provide all labor, tools, equipment, hoses, gauges, test equipment, hearing protection, eye protection including prescription safety glasses, materials, supplies and parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA to pump wet wells at Building 1306. Services encompass continuous 24/7 on-site presence of certified vacuum/tanker truck(s) and qualified operators; direct suction and extraction of raw sewage and effluent from the designated HAFB lift station wet well(s) at Building 1306; over-the-road transport of domestic wastewater along authorized public transit routes between HAFB and the Town of Lexington municipal discharge location; safe, controlled discharge into the Town of Lexington receiving pump station; and implementation of spill prevention, traffic management, and emergency response protocols.
We post new waste & recycling collection opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"01731-2107""HANSCOM AFB""MA""USA""CP 781 225 0073""16 EGLIN ST BLDG 1604""PWS Wet Wells.pdf"198772"file"".pdf""1""2026-11-17T11:48:32.291+00:00""0d5cceaa0b96484aa4b637ac80178299""public""0""public""7291bfee6fbc4ba7a7da399ac5edcf77""0"4"0""SF1449 Cover Letter FA283527Q0004.pdf"325078"file"".pdf""1""2026-11-16T18:32:38.119+00:00""993c844c19964497ae86fe0c814015a3""public""0""public""db6381e3366b4e7296ec01f856df7fcc""0"3"0""Solicitation - FA283527Q0004.pdf"518359"file"".pdf""1""2026-11-16T18:32:38.119+00:00""f98b5b3b9df14d7cb2fcb9a79b9fb71d""public""0""public""f25f520e5edc417982f5f197f441677c""0"2"0""Performance Work Statement .pdf"447587"file"".pdf""1""2026-11-16T18:32:38.119+00:00""c70bc6f6c4d24a95bafa0b5da760a27e""public""2026-11-17T11:48:32.291+00:00""1""public""f23b0569c8b4468082276184789bce97""0"1"0""2026-11-17T11:48:32.291+00:00"Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 41429122cf7a4607981d82affccf3836), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.