Please see the attached combined synposis/solicitation and additional attachments.
The contractor shall manufacture and deliver 53 line items of custom-designed (build-to-print) Capstan Drive Assembly (Unit 1) and Stowage Drum/Level Wind Assembly (Unit 2) support material required for upgrades on Government infrastructure. The work includes fabricating parts such as Drive Drum Mount, Hub Bodies (P/N 53X-01-101), Idler Drum Mounting Hub (P/N 53X-01-102), Outlet Guide (P/N 53X-01-132), Scope Sensor Ring (P/N 53X-01-137), Scope Sensor Bracket (P/N 53X-01-139), Outlet Guide Clamp (P/N 53X-01-142), Retainers (P/N 53X-01-144), Torsion Spring Bracket (P/N 53X-01-165), Torsion Spring Adjustment Bracket (P/N 53X-01-166), Outlet Guide Bracket (P/N 53X-01-178), Scope Sensor Mount (P/N 53X-01-182), Manual Rotation Plate (P/N 53X-01-184), Idler Wheel Bearing Cap (P/N 53X-01-185), Idler Mounting Hub Caps (P/N 53X-01-186), Drive Wheel Bearing Caps (P/N 53X-01-187), Angle Cylinder Retainer (P/N 53X-01-192), Cylinder Hold Down Plate (P/N 53X-01-198), Handcrank Bar (P/N 53X-01-207), Idler Roller Assembly Support (P/N 53X-01-229), Idler Non-Lock Side Splice Plate (P/N 53X-01-258), Drive Lock Side Splice Plate (P/N 53X-01-259), Levelwind Driven Pulley Taper Lock Bushing (P/N 53X-02-203), Drive Sprocket (P/N 53X-02-221), Levelwind Drive Sprocket Flange (P/N 53X-02-222), Pressure Compensator Mounting Bracket (P/N 53X-02-281-2), Inlet Guide (P/N 53Z-01-131), Idler Roller Bottom Mounting Plate (P/N 53Z-01-188), Idler Roller Top Mounting Plate (P/N 53Z-01-189), Push Roller Bottom Side Plate (P/N 53Z-01-190), Push Roller Top Side Plate (P/N 53Z-01-191), Side Plate Connector Bracket Lock Side (P/N 53Z-01-212), Side Plate Connector Bracket Non-Lock Side (P/N 53Z-01-213), Drive Wheel (P/N 53Z-01-248), Idler Wheel (P/N 53Z-01-249), Static Guide, Drive Wheel (P/N 53Z-01-250), Containment, Intermediate Non-Lock Side (P/N 53Z-01-255), Unit 1 Identification plate (P/N 53Z-01-257), Levelwind Driven Sprocket (P/N 53Z-02-201), Sprocket Flange (P/N 53Z-02-254), Modified Idler End Lock Side Splice Plate (P/N 6878901), Modified Inlet Guide Bracket (P/N 6878906), Sprocket Flange (P/N 6878907), Modified Lock Side Containment (P/N 6878909), Static Guide (P/N 7443666), Coupling (P/N 8828004), Roller Bracket (P/N 8828005), Support Bracket Top Plate (P/N 8828006), Lower Static Guide Bracket (P/N 8828008), Cylinder Hold Down Bracket (P/N 8828010), Outlet Guide Clamp Bracket (P/N 8828013), Drive Drum Lock Locating Bracket (P/N 8828015), Support Bracket Base (P/N 8828016), and Intermediate Static Guide Bracket (P/N 8828017). The contractor shall perform all tasks in accordance with the Applicable Documents in Section 3.0 of the SOW, including priming and painting with specified military specifications, marking part numbers IAW MIL-STD-130, and providing required documentation such as Certificate of Compliance, Mercury Free Statement, Certificate of Analysis, and Weld Procedure Specifications/Procedure Qualification Records.
We post new goods & materials opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"02841-1703""NEWPORT""RI""USA""1176 HOWELL ST""Combined synopsis_solicitation.pdf"271972"file"".pdf""1""2026-10-08T14:24:17.361+00:00""223b89fe8fd3413b9c837654f3b8bbdb""public""0""public""e62295b9de184840bcad5f93000543ab""0"18"0""Combined synopsis_solicitation.pdf"226894"file"".pdf""1""2026-08-19T18:46:11.848+00:00""4edd7af5b1964fe6ab8c521142da6aad""public""2026-10-08T14:24:17.361+00:00""1""public""626e11d948b14b0bba84e96e81c9989f""0"17"0""2026-10-08T14:24:17.361+00:00""Statement of Work.pdf"393240"file"".pdf""1""2026-08-19T18:46:11.848+00:00""ddf0729f6954418399e221d13377d520""public""0""public""e9701ca4df3f4c0fb4e369600ec16f4e""0"16"0""CDRLS_Redacted.pdf"807246"file"".pdf""1""2026-08-19T18:46:11.848+00:00""af81ed5c77b94dad807206b0b4c45d31""public""0""public""3ac67c48ee9f4742b97baabff4cf7adc""0"14"0""RIR_QAP.pdf"4250075"file"".pdf""1""2026-08-19T18:46:11.848+00:00""14fdef2f9f514a9781353e76bb0b1013""private""0""controlled""3f792b2b4b2f454f8fe804d7ce1f39bd""1"13"0""VIR_Redacted.pdf"891405"file"".pdf""1""2026-08-19T18:46:11.848+00:00""9cafefa6f427469280c5488ff87954b7""private""0""controlled""7552ab49c36e4becad7d5f7a544ba4ed""1"11"0""Welding Cert letter_Redacted.pdf"52206"file"".pdf""1""2026-08-19T18:46:11.848+00:00""202f9001ebd5451c9ca1b96be6308612""public""0""public""d9bf3bb3310e4d7299e9f494fcb2d04e""0"2"0"Most Rhode Island work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 404f5eeb004742228e853e81c164a6fa), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.