1
0001
10-28-2026
36C250
Department of Veterans Affairs
Network Contracting Office 10
24 Frank Lloyd Wright Drive
Ann Arbor, MI 48105
36C250
Department of Veterans Affairs
Network Contracting Office 10
24 Frank Lloyd Wright Drive
Ann Arbor, MI 48105
To all Offerors/Bidders
36C25027Q0051
10-21-2026
X
X
X
1
See CONTINUATION Page
This amendment is to correct the Combined Synopsis page which states "this requirement is 100% set aside for Small
Business (SB).
This language is corrected to now read "this requirement is 100% open market and unrestricted."
No other terms and conditions are changed as a result of this amendment.
Jeannie Ortiz
Contracting Officer
The contractor shall provide all labor, parts, materials, personnel, transportation and supervision to perform preventive maintenance and non-routine emergency maintenance services of the Reverse Osmosis (RO) Equipment Systems located at the Ann Arbor VA Medical Center. Preventive maintenance services consist of quarterly, semi-annual, and annual visits to evaluate system components, replace consumable system components, generate Field Service Reports, and recommend corrective actions. Emergency maintenance services consist of making timely and critical repairs to reverse osmosis equipment, with a requirement to respond to all callbacks and be prepared to take corrective action at the site within 8 hours. The work covers RO water systems serving the Sterile Processing Service (SPS) and the Laboratory Department (Lab), including specific tasks such as replacing prefilters, carbon tanks, UV bulbs, RO membrane filters, and performing loop sanitizing. The contractor must also deliver legible field service reports, schedule service dates with Facilities Management two weeks in advance, and check in with the Plant Supervisor.
We post new appliances opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""45428""DAYTON""OH""USA""VISN 10 CONSOLIDATED CONTRACTING""4100 WEST 3RD STREET""36C25027Q0051 0001_1.docx"32574"file"".docx""1""2026-10-28T11:25:26.08+00:00""9e0eb1b0c9a14c90aa978917f452fa97""public""0""public""c5d7109801da42adb2486cfc3dfee5cc""0"2"0""36C25027Q0051_1.docx"136679"file"".docx""1""2026-10-21T15:40:20.618+00:00""bd327b7aae65476ba490a2dbc051754e""public""0""public""6587737d1a194890becf63da7ce739fc""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 40032db1450444e5a2b8ee622e223186), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.