Request for Proposal RFP PR507071 is for the fabrication and delivery of the proof of concept "Neptune" Cask Interface Facility. This has an ISO9001 requirement.
The scope of work includes the design modification, fabrication, assembly, factory acceptance testing (FAT), and delivery of a functional, stand-alone Cask Interface Assembly unit for a Modular Hot Cell (MHC). The Seller shall fabricate the Mechanical Cask Interface Assembly per drawing MMHC1CAVE20-ASSY-R0 and design and fabricate a support stand that integrates with the assembly for testing and operation. The work also includes procuring and assembling all components, performing a factory/shop acceptance test, and packaging and delivering the unit to a location designated by the Company. The Seller must also provide deliverables such as preliminary and final support structure designs, a bill of materials, operating and maintenance instructions, and as-built drawings.
We post new goods & materials opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""37831""Oak Ridge""TN""USA""Oak Ridge National Laboratory""PO Box 2008""RFP PR507071 Neptune Amendment 01.pdf"1033386"file"".pdf""1""2026-10-15T14:30:12.786+00:00""8a1ed11229ac4cf6a4c99fe1944b41ff""public""0""public""830c8b38469e479a8fce575cfce8abcd""0"9"0""RFP PR507071 Neptune.pdf"360688"file"".pdf""1""2026-10-13T19:19:41.59+00:00""5792ecd9d760462e94ca51f3c7ca09b6""public""0""public""e82dce5575154b5fbf60cecb1b9a0826""0"8"0""Attachment H Draft FFP Subcontract PR507071.pdf"298786"file"".pdf""1""2026-10-13T19:19:41.59+00:00""e183aea544674cd69d104310cdedd07e""public""0""public""693878c0d80a4f31bf00981da7a5bd96""0"7"0""Attachment F Reps-and-Certs-Abbreviated-2026.03.09.pdf"993986"file"".pdf""1""2026-10-13T19:19:41.59+00:00""4a8b95d6a5bb412d972f7f33a151240f""public""0""public""4570a35b05064e228174674825bab0f8""0"6"0""Attachment E Milestone Payment Clause.pdf"13569"file"".pdf""1""2026-10-13T19:19:41.59+00:00""efdbffce13bf488f99736094b466b2de""public""0""public""fe778ee43d5746c0a23efcd7160f6244""0"5"0""Attachment D Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf"297899"file"".pdf""1""2026-10-13T19:19:41.59+00:00""6671d0f236a04e49ba92206f3820b05d""public""0""public""8299b0e5125b4b8ead75cc6e4064952c""0"4"0""Attachment C Terms-Conditions-Fixed-Price-BSD-CS-2150-09.30.2026-1.pdf"469001"file"".pdf""1""2026-10-13T19:19:41.59+00:00""a75d0cf316974a48a80884313d4fec9d""public""0""public""a54ff66756514c6e8bfba6dab5e5d287""0"3"0""Attachment B Quality Assurance Special Provisions.pdf"44306"file"".pdf""1""2026-10-13T19:19:41.59+00:00""56cfb203e9a74be8b2fd63aeba128799""public""0""public""9707373c73c942dc8271d50e25ac27c5""0"2"0""Attachment A MHC-DS-SPEC-005-R0.pdf"35737618"file"".pdf""1""2026-10-13T19:19:41.59+00:00""7c3e630b74ed43b2ab2d318d6628edfa""public""0""public""4fb42851b1844433881119b412659010""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 3d6856cb7d0c4e78b3a3de6481cbee10), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.