See Attached File(s)
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power and accessories to perform component overhauls utilizing genuine OEM parts and to furnish genuine OEM, service-ready parts in support of the 154' FRC. Overhaul work covers A1, A2, B1 and B2 turbos, cylinder heads, starters, coolant pumps, sea water pumps, intercooler cores, control levers, oil coolers and LOP 8-06 units, each requiring open/inspect with an Inspection Report per Para. 3.1 and overhaul with a Final Test Report per Para. 3.2 of specification P-233-2039, including labor, mandatory parts, average cost of contingency parts, PPM and shipping. The contractor also prices a catalogue parts list for the 20V4000M93L series MDE as a percentage increase or decrease off list price, core exchange pricing with core deposit and damaged core refund, and on-site technical support and travel. All items are to be individually packaged, marked and shipped F.O.B. destination, with each unit preserved per OEM specifications, hermetically sealed in shrink wrap vapor barrier with desiccant for a minimum two-year protection period, and packaged in a Type I, Class 2, Style A, MIL-C-104C compliant crate labeled per SFLC specification SP-PP&M-001.
We post new goods & materials opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"FRC MTU Solicitation RFO Part 15.109 Final.pdf"1291270"file"".pdf""1""2026-11-02T16:09:13.279+00:00""1689a2b078464667ad32437b7c8fcdeb""public""0""public""7eba8644d0184a79b317b2a4356077fb""0"4"0""Attachment 3 - Quoters Proposed Delivery Schedule.doc"107008"file"".doc""1""2026-11-02T16:09:13.279+00:00""61121944205e4290bc0177bc5edd88d6""public""0""public""c7136f6b7f4447ae843d31767a793ef0""0"3"0""Attachment 1 - Schedule of Supplies.xlsx"52209"file"".xlsx""1""2026-11-02T16:09:13.279+00:00""dcd6e20bdd50481581f7a13e240e656e""public""0""public""7a84081619ae4a5ebbc85d8520084f8a""0"2"0""Attachment 2- FRC MTU MDE Component Overhaul and Parts SOW P-233-2039_rev 3 (5-7-26).docx"103432"file"".docx""1""2026-11-02T16:09:13.279+00:00""e9638a5bf8be4e009f12a8fcfc083cdf""public""0""public""9d0dc9a4be3848e1a4437dfc17dbe456""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 3d518f0568ec489bb410f5275148ad08), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.