We'll email you new vehicles & fleet opportunities in Washington as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR 12.201 Solicitation procedures. This announcement constitutes the only solicitation. Quotations are being requested and a written solicitation will not be issued.
Solicitation number 69056727Q000005 is issued as an (RFQ) for Modular Buildings & Restroom Rental with Ancillary Services. This requirement is to support and maintain WFLHD operations during the Division Office Facility Renovation by obtaining prefabricated modular office building(s), single-wide container/modular office units, and an executive restroom trailer on a temporary lease basis, including professional delivery, site preparation, installation, utility connection, preventative maintenance, weekly septic pumping maintenance, technical troubleshooting support, and eventual teardown/demobilization.
Additional information as required in FAR 12.202(b)(1) is provided in the RFQ document attached herein.
This acquisition is UNRESTRICTED FULL & OPEN and incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/faroverhaul/far-part-deviation-guide/far-overhaul-part-52. The North American Industry Classification System (NAICS) code is 532490 with an industry size standard of $40.0 million and the associated Product Service Code (PSC) is W054.
All interested vendors shall refer to Section E for full-text FAR Provision 52.212-1, Instructions to Offerors, and its Addendum.
The contractor shall procure and supply one 24'x60' double-wide modular office building (1,440 SQFT) with a minimum of three offices, one small secure meeting room, and two conference rooms; two 8'x40' single-wide container/modular office units (320 SQFT each) with full HVAC; and one modern, climate-controlled executive restroom trailer (3-station minimum). The contractor shall manage transport F.O.B. Destination to Vancouver, WA, perform site preparation including minor grading and leveling, professional installation including block and level setup, construct and certify full utility service connections, and provide post-installation re-leveling. The contractor shall also provide weekly septic pumping, freshwater refills, quarterly preventative maintenance, technical support, winterization, and an account manager. At lease conclusion, the contractor shall perform complete demobilization within 30 calendar days, including dismantling steps and ramps, stripping skirting, decoupling the multi-plex, final septic pumping, disconnecting utilities, and restoring the site to original condition.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""69056727Q000005 QandA_2026-11-21.pdf"165105"file"".pdf""1""2026-11-23T19:52:35.812+00:00""4100785b038a4736805a20d8382d3969""public""0""public""7cbdc68a492b4a7c94a537273c466dd8""0"10"0""69056727Q000005_Amend 0004.pdf"289398"file"".pdf""1""2026-11-13T13:52:21.129+00:00""967b768031384a868614d68de1558e19""public""0""public""40d661fbc112413390c47dd2db0bfb2a""0"9"0""69056727Q000005 QandA_2026-11-13.pdf"162385"file"".pdf""1""2026-11-13T13:52:21.129+00:00""8f5451e6d1e3435987e436702fa19f5b""public""0""public""f690bad21cea45b4b12bb4c603653566""0"8"0""69056727Q000005_Amend 0003.pdf"692151"file"".pdf""1""2026-11-10T23:16:28.411+00:00""ac2d30f38f9649b1a29c41c5d93bfd67""public""0""public""7aa85ea5564b4a88a3650c9720721558""0"7"0""69056727Q000005 QandA_2026-11-10.pdf"163379"file"".pdf""1""2026-11-10T23:16:28.411+00:00""80d1b76c081142f98b4b581379ea3395""public""0""public""ed8e2c75cf8b4f3e90a297cc3e9922ea""0"6"0""69056727Q000005_Amend 0002.pdf"432673"file"".pdf""1""2026-11-06T21:09:16.853+00:00""38d60906b92c4f0aab78ef6ad526b4bb""public""0""public""287f144747d04327b85fa48db9815212""0"5"0""69056727Q000005 QandA_2026-11-04.pdf"172513"file"".pdf""1""2026-11-05T17:23:42.981+00:00""77ce8fdcf9f64dc9af36e5d2a24b192d""public""0""public""26c61573a4554a97b0ee7f6914c660b3""0"4"0""69056727Q000005 QandA_2026-11-03.pdf"114173"file"".pdf""1""2026-11-05T17:18:18.438+00:00""57bbd2038d33431fa73b313273ab85aa""public""0""public""9f9c87e6f07b4d0fb3250b712c7e42a2""0"3"0""69056727Q000005_Amend 0001.pdf"342828"file"".pdf""1""2026-11-02T21:52:24.835+00:00""3c61f237c4204db7ac1c293f4613dfde""public""0""public""5e05924ec85a4f92aa28876649fcf52c""0"2"0""69056727Q000005_rfq.pdf"1057061"file"".pdf""1""2026-10-28T21:36:59.724+00:00""e6050568f6874b7780eddaf483bff115""public""0""public""5b94d2516a2b40e0b7754e9d2fb50518""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 39aab37b1dd640f9a9ada171c57049e5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.