Amendment 2 - 9Nov2026 - Purpose is to extend the proposal due date. An updated FOPR Letter will be uploaded to this post.
5Nov2026 - Update questions & answers (v3) have been posted below. Additional questions are being worked and will be posted next week
2Nov2026 - Updated questions & answers (version 2) have been posted below. Additional questions are being worked and will be posted in the near future.
Amendment 1 - The purpose of this amendment is to incorporate Attachment J - Original Equipment Manufacturer of AAGs. An updated FOPR letter and Attachment J will be uploaded to this post as attachments. Questions were also received regarding this solicitation. The questions and Government answers are also being provided as an attachment in this post.
The purpose of this requirement is to develop Aircraft Adapter Groups (AAGs) designed for the F-16 aircraft which includes the required production level software, hardware, and corresponding technical orders. The AAGs are to be integrated into the Government developed and designed Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV).
The contractor shall develop Aircraft Adapter Groups designed for the F-16 aircraft, including required production level software, hardware and corresponding technical orders, for integration into the government developed and designed CAPRE Secure Memory Loader Verifier. New AAG software is to be developed from the ground up. The contractor shall obtain LRU data and artifacts from the original equipment manufacturers for 10 line replaceable units, establish commercial agreements and licensing and purchase required intellectual property, manufacturing rights, drawings and licenses, with software integration lab access and technical order access provided after award for testing and integration. Production includes six hardware articles and a total of 1800 cables for ALQ-131, Anti-Skid, CPDG/eCPDG, CSFDR, EEFCC and FCSDR, beginning with production ready cables for government design confirmation.
We post new it & software opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"31098-1670""ROBINS AFB""GA""USA""CP 478 926 1384""236 MILLEDGEVILLE ST STE F30""Letter FOPR - Amd 2 - F-16 AAGs CAPRE SMLV - FA8533-26-R-0007.pdf"231394"file"".pdf""1""2026-11-09T13:47:09.451+00:00""7fa67fcac15a4c16895c1405c635ab4a""public""0""public""f727bc25bd014b1db0a091f8a340ac87""0"7"0""ATSA-I_CAPRE_Questions Comments v3.pdf"121421"file"".pdf""1""2026-11-05T20:23:53.861+00:00""32c53ffd70174306bd6fc5b31c162339""public""0""public""2373936239b149169bdb14d97d358959""0"6"0""ATSA-I_CAPRE_Questions Comments v2.pdf"113098"file"".pdf""1""2026-11-02T19:02:13.151+00:00""1ae03a2274124c038abc27a2d185cf07""public""0""public""f41d0163c946456098601c91028a93db""0"5"0""ATSA-I_CAPRE_Questions Comments.pdf"92213"file"".pdf""1""2026-10-05T16:00:18.031+00:00""0ed85107288b48838ad9f0be62a85109""public""0""public""68d8e4682bb4482693397c7bd50cad70""0"4"0""Attachment J - Original Equipment Manufacturer of AAGs.pdf"80957"file"".pdf""1""2026-10-05T16:00:18.031+00:00""a08ca4e6e60b471aa4d8d6b789abdd77""public""0""public""77de0c10d3e144b49ab39c57e2668f37""0"3"0""Letter FOPR - Amd 1 - F-16 AAGs CAPRE SMLV - FA8533-26-R-0007.pdf"264698"file"".pdf""1""2026-10-05T16:00:18.031+00:00""c48ae0b2919b4ef2976921e30f04f4d4""public""0""public""0140f3146d1748ecb56d98e9d94ac7ce""0"2"0""ATSA-I FOPR Announcement - FA8533-26-R-0007.pdf"152590"file"".pdf""1""2026-09-17T12:26:12.788+00:00""d0cc7317614e401b9fb4fcd789bb955a""public""0""public""7d8eec3a457b4dd798efa30d0e9f69be""0"1"0"Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 373157090b8e4dd8a641e682d5dcafd5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.