Provide all labor, materials, tools, equipment, delivery, and disposal necessary to replace four existing exterior emergency exit door assemblies at U.S. Coast Guard Station Fire Island. Perform one-for-one replacement in the existing openings using standard installation methods. Maintain the existing opening sizes, locations, door handing, swing, and emergency exit function. No structural alterations, opening enlargement, or changes to fire alarm or access control equipment are included.
When submitting your quote, please provide a detailed breakdown (parts, labor, etc.) so we better understand how you're coming up wtih your pricing. This submission can be done on the attached 1449 or your own personal letterhead. When completed, the quote will be emailed to Coyet Carter (Coyet.A.Carter@uscg.mil) and Jason Williams (Jason.l.williams@uscg.mil).
SEE SOW FOR FULL DETAILS
Provide all labor, materials, tools, equipment, delivery and disposal to replace four exterior emergency exit door assemblies in existing openings with complete commercial aluminum assemblies, frames, vision lites with safety glazing, panic devices, closers, hinges, locking trim, thresholds and weatherstripping suitable for coastal salt-air exposure. Field-verify openings, submit product data and wind/storm performance for review, remove and dispose of existing assemblies, install new frames plumb and anchored with sealant, adjust hardware for free swing, controlled closing, positive latching and keyless egress, coordinate keying and access with the COR, complete within 30 days during designated hours, and provide keys, documentation, demonstration and one-year warranty with Government acceptance inspection.
We post new interior installation opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"FAR CLAUSES_CONSTRUCTION 35K TO 250K.docx"20724"file"".docx""1""2026-11-23T18:44:58.022+00:00""e5d343a95d5f4ae39a55e31594526bba""public""0""public""901c98b4204d471296040d2eade1bd68""0"4"0""DEI CLAUSE FOR SOLICITATIONS.docx"15504"file"".docx""1""2026-11-23T18:44:58.022+00:00""1f308d26b5ad4d4a8ab67e78ebae35fd""public""0""public""6b15648d2e544424a4fa610be0da2dc7""0"3"0""SF1449-21_BLANK.pdf"811439"file"".pdf""1""2026-11-23T18:44:58.022+00:00""386f4358f36b421980cf25592b2dbc35""public""0""public""5c026c2b3e9c472e9c14f1ea31216a6a""0"2"0""Station_Fire_Island_Emergency_Doors_SOW.docx"4195269"file"".docx""1""2026-11-23T18:44:58.022+00:00""ec44d909d3dd4b32bba562dbe5b0e933""public""0""public""0292737d60e94e3a88e020fa8b081985""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 34839a6a40404ded93d81620bf604bc4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.