UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Laboratory Protection Division at ORNL is in need of an Outdoor IR Dome Camera and Adapter or equivalent. Please reference Attachment C- RFQ517023 Bill of Materials for product specifications.
Attachments:
RFQ517023
Attachment A- Terms and Conditions Purchase Order Commercial Products and Services
Attachment B- Prime Flowdown Clauses
Attachment C- RFQ517023 Bill of Materials
Attachment D- Reps and Certs Abbreviated
The bidder must supply 20 units of a 4MP H6A Outdoor IR Dome Camera with 4.4-9.3mm Lens (part number 4.0C-H6A-DO1-IR-B) and 20 units of an In-ceiling Adapter, 7.5" Dia, Grey (part number CLADP-1001), as specified in the Bill of Materials. The items must be provided under a Firm Fixed Price subcontract, with a quote including a proposed delivery schedule, and the Seller must be an authorized reseller of the products.
"Richland""WA""US""2345 Stevens Drive""37831""Oak Ridge""TN""USA""Oak Ridge National Laboratory""PO Box 2008""RFQ517023.pdf"213939"file"".pdf""1""2026-11-16T18:39:55.546+00:00""e6800c0b00a04644a795b4e8c200277d""public""0""public""e4a03cd9727f402294f7403f4b50c02d""0"5"0""Attachment A - Terms-Conditions-Purchase-Order-Commercial-Products-Services-BSD-CS-2154-09.30.2026.pdf"270213"file"".pdf""1""2026-11-16T18:39:55.546+00:00""c81cfb42e6a2452382637938380544a9""public""0""public""ed3dbcf7f18e488691c9fe807f548546""0"4"0""Attachment B - Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf"297899"file"".pdf""1""2026-11-16T18:39:55.546+00:00""5ff8fb4e55504426b95d53181bbaaee5""public""0""public""6f67680543c94e82b5259e507e6b4d56""0"3"0""Attachment C - Reps-and-Certs-Abbreviated - 2026.03.09.pdf"987929"file"".pdf""1""2026-11-16T18:39:55.546+00:00""d383645f2811493cb60c85f93647f576""public""0""public""c43e4a000c60459a8c8a6aa13551fd6b""0"2"0""Attachment D - Bill of Materials.pdf"74103"file"".pdf""1""2026-11-16T18:39:55.546+00:00""682881b489fc4ef49d218ed677d8fb2e""public""0""public""e5db0308897d4ff0a2c42549eb4bc8c0""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.