In response to a clarification inquiry from an A/E firm, the SF330 submission deadline has been extended from October 30, 2026, to November 10, 2026, at 12:00 PM CT. A response to the inquiry will be issued in a subsequent modification to the pre-solicitation notice as soon as possible.
This project renovates main lobbies in B1 and B53 to improve veteran experience, replacing architectural finishes including floors, walls with handrails and wall protection, and ceilings in public areas, main entrances, canopy, elevator lobbies and waiting rooms, covering about 4,000 DGSF in B1 and 2300 DGSF in B53, including a reimagined B1 entrance canopy, relocated B1 entrance with airlock and sliding doors, reception update, B53 vestibule doors, volunteer station, restroom fixtures and partitions, correction of condition deficiencies and FCA items within boundaries, and survey and abatement of asbestos and lead, with design delivered through schematic, design development and construction documents plus construction period services.
We post new architecture and design opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""66048""LEAVENWORTH""KS""USA""VA MEDICAL CENTER""4101 SOUTH 4TH STREET""36C25527R0007_1.docx"14630"file"".docx""1""2026-10-28T21:25:39.409+00:00""ebbf043807c148e990822a5f3881b4e6""public""0""public""7d68e0e074dc405d9afc2d09e0758351""0"3"0""P09 Revised Supplement B - PN 657-27-209JB.pdf"4900932"file"".pdf""1""2026-10-22T18:10:37.984+00:00""9b3d7c992d544544b178af44bc8efd79""public""0""public""5b5a1e64aaba4974932a9900d4bee555""0"2"0""36C25527R0007.docx"29420"file"".docx""1""2026-10-22T18:10:37.984+00:00""746ff5e96a7f446c8ac6355f405a9f70""public""0""public""3b31dbd77fbc4b619154e29999a3a6c7""0"1"0"Most Missouri work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 33db7c7fbe3d4526be3a451c33510844), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.