We'll email you new generators opportunities in Virginia as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The contractor will be required to provide all labor, tools, equipment, supplies, materials, expertise, and supervision necessary to perform generator maintenance, inspection, testing, load bank testing, and repairs on twelve (12) emergency generators located in various building at the Hampton VA Medical Center, Hampton Virginia.
Provide all labor, tools, equipment, supplies, materials, expertise and supervision to perform quarterly preventive maintenance inspections on twelve emergency generators, annual fluid and filter changes, annual fuel testing and underground storage tank tightness testing, four-hour continuous load bank tests in April 2027 and April 2029, and 24/7 emergency repairs, with formal written reports within 15 calendar days after each inspection or test and coordination through the Electrical Shop Supervisor.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""36C24627Q0138.docx"610815"file"".docx""1""2026-11-19T17:29:24.315+00:00""3a562bdb1f89400c9adc2ca26036087c""public""0""public""1d1bb8b6e1a740b1aa08dbfb9ad06cd9""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 31264a43f95f4d4183d993fb2e8b1c3d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.