Read the notice and its 8 attached documents and pull out the scope, the deadlines and what you have to submit.
PRIMARY MAC - The purpose of the Vertical Construction MAC is to provide design-bid-build and design-build construction services for a broad range of military renovation and construction projects, primarily in support of the Malmstrom AFB installation, Launch Facilities (LF), and Missile Alert Facilities (MAFs). Work performed under Vertical Construction MAC orders may include but is not limited to the repair, renovation, alteration, and/or demolition of various vertical structures, building equipment & systems (plumbing, electrical, HVAC, fire suppression, etc.), and interior/exterior finishes. The initial ordering period is projected to be five (5) years with a two (2) year option year (potential total contract length of seven (7) years) and will have an estimated overall contract ceiling of $99,999,999.99.
SEED PROJECT – The proposed initial task order to be awarded under the Vertical Construction MAC is the DSN/CSN Repair Bldg. 1082 HVAC project on Malmstrom AFB, MT. This project consists of developing conceptual documents for two (2) courses of action (COAs) to provide backup cooling and humidification along with a rough order of magnitude for each COA. The COAs should include HVAC components similar to the existing system. The Government will select one (1) COA to take to the 65% design and develop into a 100% Type B design. The seed project period of performance is 242 calendar days after receipt of notice to proceed (NTP). Construction may commence after acceptance of the 65% design.
We post new general contractors opportunities in Montana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"59402-6863""MALMSTROM AFB""MT""USA""CP 406 731 3744""7015 GODDARD DR BLDG 145""Solicitation - FA462626R0007 - DRAFT.pdf"1840017"file"".pdf""1""2026-08-31T14:25:21.823+00:00""6f873312cdb04132afe2fca8984cf843""public""0""public""8f75c07f73144784b45b5d2faa22e78c""0"8"0""2_BW As-Builts 2009 HVAC B 1082.pdf"1794204"file"".pdf""1""2026-08-31T14:25:21.823+00:00""cb343b4a7f9743299e0fc8d8d69b35bd""public""0""public""f99b6f0d4184450e9db8c5d1cc24b532""0"7"0""2_As Builts 2009 HVAC - DRAFT.pdf"9649855"file"".pdf""1""2026-08-31T14:25:21.823+00:00""2501c05b9f0b48029aca1721c8c62df9""public""0""public""2980e747a51548a08451d414c266bc87""0"6"0""4_Bldg. 1082 Asb Pb Survey Results_2009 - DRAFT.pdf"3936926"file"".pdf""1""2026-08-31T14:25:21.823+00:00""32023c9b238b4fd491f750a649f78b57""public""0""public""89d9def9fa4c4b3796981b56b59a7804""0"5"0""4_ACM Report_2015 - DRAFT.pdf"1499664"file"".pdf""1""2026-08-31T14:25:21.823+00:00""00d863df7c1040b0945e18ac4320613d""public""0""public""4907b68a7e0441818316f43d38f19f93""0"4"0""1_Design Build SOW - DRAFT.pdf"731744"file"".pdf""1""2026-08-31T14:25:21.823+00:00""574816166d064e4385729d6ec71ba1ea""public""0""public""fd8feb74d50f40a495b890b730d97a39""0"3"0""3_Bldg. 1082 HVAC Submittal Schedule - DRAFT.pdf"585796"file"".pdf""1""2026-08-31T14:25:21.823+00:00""4a1373d0a9f446438f375e1222477e10""public""0""public""50284a312db845c0a1cc156e541670a3""0"2"0""Vertical MAC Pre-Sol Notice.pdf"124337"file"".pdf""1""2026-08-31T14:25:21.823+00:00""b9201374cd804d4cbc6a6e194d33d6f0""public""0""public""f1021c1129a04876a661e02d887088c5""0"1"0"Most Montana work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 30410a5355d243899c07074f04277831), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.