5Nov2026 - Update questions & answers (v3) have been posted below. Additional questions are being worked and will be posted next week
2Nov2026 - Updated questions & answers (version 2) have been posted below. Additional questions are being worked and will be posted in the near future.
Amendment 1 - The purpose of this amendment is to incorporate Attachment J - Original Equipment Manufacturer of AAGs. An updated FOPR letter and Attachment J will be uploaded to this post as attachments. Questions were also received regarding this solicitation. The questions and Government answers are also being provided as an attachment in this post.
The purpose of this requirement is to develop Aircraft Adapter Groups (AAGs) designed for the F-16 aircraft which includes the required production level software, hardware, and corresponding technical orders. The AAGs are to be integrated into the Government developed and designed Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV).
The contractor shall develop Aircraft Adapter Groups designed for the F-16 aircraft, including required production level software, hardware and corresponding technical orders for integration into the Government developed CAPRE Secure Memory Loader Verifier covering 10 line replaceable units, produce six hardware articles and a total of 1800 cables across ALQ-131, Anti-Skid, CPDG/eCPDG, CSFDR, EEFCC and FCSDR, obtain LRU data and artifacts from original equipment manufacturers, and use Software Integration Lab access for testing, interface validation and software-loading verification.
We post new it & software opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"31098-1670""ROBINS AFB""GA""USA""CP 478 926 1384""236 MILLEDGEVILLE ST STE F30""ATSA-I_CAPRE_Questions Comments v3.pdf"121421"file"".pdf""1""2026-11-05T20:23:53.861+00:00""32c53ffd70174306bd6fc5b31c162339""public""0""public""76d209d7a0da4e49b7dfb485fb601083""0"6"0""ATSA-I_CAPRE_Questions Comments v2.pdf"113098"file"".pdf""1""2026-11-02T19:02:13.151+00:00""1ae03a2274124c038abc27a2d185cf07""public""0""public""3fae0e25ff8f45248804da85fb0698f2""0"5"0""ATSA-I_CAPRE_Questions Comments.pdf"92213"file"".pdf""1""2026-10-05T16:00:18.031+00:00""0ed85107288b48838ad9f0be62a85109""public""0""public""3b6db613f74449cab6b4b5fc8be67513""0"4"0""Attachment J - Original Equipment Manufacturer of AAGs.pdf"80957"file"".pdf""1""2026-10-05T16:00:18.031+00:00""a08ca4e6e60b471aa4d8d6b789abdd77""public""0""public""b7465317d89e452a94eef1432087d3bc""0"3"0""Letter FOPR - Amd 1 - F-16 AAGs CAPRE SMLV - FA8533-26-R-0007.pdf"264698"file"".pdf""1""2026-10-05T16:00:18.031+00:00""c48ae0b2919b4ef2976921e30f04f4d4""public""0""public""87ee61ff75264959885d2ef5a7c5f3b8""0"2"0""ATSA-I FOPR Announcement - FA8533-26-R-0007.pdf"152590"file"".pdf""1""2026-09-17T12:26:12.788+00:00""d0cc7317614e401b9fb4fcd789bb955a""public""0""public""9d4ee540f03f40efaad84f6aea245b93""0"1"0"Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2e9297fbd6ec40c1b1b6be5661e775c2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.