CUSTOM MOBILE FIELD LABORATORY VAN BUILD
The Contractor shall provide all goods, labor, travel, supervision, and materials necessary to build out a mobile lab van per 24 specification items: includes floor plan and layout, shelving, cabinets, laminate countertops with sinks, overhead cabinets, LED lighting, 12-volt and 110-volt outlets, switches, inverters, solar panels with regulator, batteries, marker and flood lights, windows, insulation, rubber flooring, and partition walls. The van shall be delivered by not later than 03/31/2027, and all work must be inspected and accepted by the USGS APOC.
We post new equipment maintenance & rental opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""80225""DENVER""CO""USA""DEN FED CTR, PO BOX 25046, MS 204""Sol_140G0226Q0173.pdf"585437"file"".pdf""1""2026-09-11T03:06:39.495+00:00""201b6f8469444502be30a903900a6512""public""0""public""b642f9d58df14deb8278e6655403ca47""0"2"0""B08_Attachment_1_-_Exhibits_A-I.pdf"1537096"file"".pdf""1""2026-09-11T03:06:39.495+00:00""1573206d49d2435590a655896b95aded""public""0""public""25065786958a4331abd55ea6959f3d90""0"1"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 2c220e5688ce468fa5bbf144350c61b6), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.