Removal and placement of attic ventalation fans in accordance with the attached Statement Of Work (SOW)
All wages and benefits must be in accordance with the wage rates for the Place of Preformance and Period Of Preformance. Wage rates attached.
The contractor shall provide all labor, materials, equipment, supervision, transportation, removal, installation, and testing necessary to replace four attic exhaust fans and associated controls at Station Fire Island. The work includes removing four existing fans, motor-operated dampers, and obsolete controls; providing four new inline centrifugal cabinet exhaust fans (Loren Cook Gemini GN-500 with Vari-Flow EC motor or equal, each providing at least 500 CFM at 0.10 inch w.g. ESP); providing adjustable thermostats and manual continuous-operation controls; suspending fans from existing framing; reusing existing branch circuits; and testing all four fans to demonstrate proper operation and airflow of at least 500 CFM per fan. The work is limited to equipment replacement and minor associated connections; no new circuits, panel upgrades, structural reinforcement, or major duct rerouting are included. The contractor must submit product data for Government review before procurement and provide a one-year warranty on workmanship and installed equipment.
We post new equipment maintenance & rental opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Station_Fire_Island_Exhaust_Fan_SOW.docx"4745972"file"".docx""1""2026-11-13T14:42:59.094+00:00""33d237412d9d485ba7f749f184807f28""public""0""public""e34bcac1012d468e8832f70f14544b4a""0"7"0""WAR Clauses.docx"47638"file"".docx""1""2026-11-13T14:42:59.094+00:00""9abc866da60c4334a7ceec401437566a""public""0""public""b8311ddd1c714192805d7e4806d8bad6""0"6"0""DEI_FAR_Clause.docx"16665"file"".docx""1""2026-11-13T14:42:59.094+00:00""de2bb799e3914c68a7dca1cc221a4475""public""0""public""689231d721be4cb989bebece7e21589b""0"5"0""WAR Clauses.docx"95240"file"".docx""1""2026-11-12T16:54:24.13+00:00""3bbab7d4c29b4011973b0c6c31059565""public""2026-11-13T14:42:59.094+00:00""1""public""1dd69bc40c0d440882e299c7a00f5296""0"4"0""2026-11-13T14:42:59.094+00:00""DEI_FAR_Clause.docx"15903"file"".docx""1""2026-11-12T16:54:24.13+00:00""abea0978addd413d833c9de1cd05bece""public""2026-11-13T14:42:59.094+00:00""1""public""bda0ade992ef4c88be7963ae6e3ea4a8""0"3"0""2026-11-13T14:42:59.094+00:00""Wage Rates 15-4157.txt"44425"file"".txt""1""2026-11-12T16:54:24.13+00:00""bfb6f27191864f30ba83707317a4003a""public""0""public""099e05add8144b18ac34a073340a2175""0"2"0""Station_Fire_Island_Exhaust_Fan_SOW.docx"4812808"file"".docx""1""2026-11-12T16:54:24.13+00:00""4f149a22d009454491f38981f0196ac7""public""2026-11-13T14:42:59.094+00:00""1""public""e2cd2f5c67744727b97545eebc265e39""0"1"0""2026-11-13T14:42:59.094+00:00"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2be58b8413ee42ec9e9e49cb06f12e81), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.