The CES Hazardous Waste and Toxics Program has identified the need for asbestos surveys, sampling, and reporting at Buckley Space Force Base (BSFB). This requirement is exclusively for the protection of military and civilian personnel performing maintenance on BSFB buildings, not for contractors performing contracted work or projects. The contractor will be required to provide all management, supervision, labor, tools, equipment, parts, transportation, supplies, and all other services necessary and be performed by a Certified Asbestos Building Inspector (CABI).
The CABI must be certified by Colorado Department of Public Health and Environment and meet the requirements of 25-7-507, C.R.S. and Air Quality Control Commission Regulation No. 8, Part B. All certifications and requirements will be reviewed by 460 CES/CEIE, Toxics Program Manager before contract award.
The contractor shall provide all management, supervision, labor, tools, equipment, parts, transportation, supplies, and all other services necessary to perform asbestos surveys, sampling, and reporting at Buckley Space Force Base. Services include routine asbestos surveys and bulk testing (up to 20 samples per call-out), independent asbestos abatement air monitoring with daily/weekly reporting, and emergency call-out response with a 2-hour on-site response time. The contractor must collect bulk samples from various facilities and soils, provide written reports within ten business days, and conduct air monitoring during asbestos abatement. The work is performed on a call-out basis, with routine responses within 7 business days and urgent responses within 2 hours.
We post new professional & consulting services opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"80011-9572""BUCKLEY AFB""CO""USA""CP 720 847 6437""510 S ASPEN ST RM 120D""Solicitation - FA254327Q0003.pdf"642041"file"".pdf""1""2026-11-03T16:58:07.545+00:00""d29d670cb38b4cc79f42f1950e7764c0""public""0""public""0249bdc396dd476a8fcb3ccc93a347e5""0"4"0""Attachment 3 - Instructions and Basis of Award.pdf"267678"file"".pdf""1""2026-11-03T16:58:07.545+00:00""375ef706e20742d8b07d3e24365c9ac0""public""0""public""d3c918a1664347b38a71608516f1e8b7""0"3"0""Attachment 1 - BSFB Asbestos Survey Services PWS Final.pdf"242211"file"".pdf""1""2026-11-03T16:58:07.545+00:00""f92165fbfc6f4392b9b2aeef84e9393b""public""0""public""05f252eaa62045638c3a8642e47de681""0"2"0""Attachment 2 - Questions Template.xlsx"21064"file"".xlsx""1""2026-11-03T16:58:07.545+00:00""3dc2e05cb033405b9eb94862be5fd94e""public""0""public""050ec6fbfaf4481897b09d61d3b1bfab""0"1"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2aad90d6aa1f4120bfffc544d7899799), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.