The objective of this work effort is to have a Subcontractor design and build a pilot-scale cement kiln system. The system includes the associated feed, cooling, grinding, and environmental control components. The kiln will be a horizontal rotating shaft heated using natural gas, with drive motors, blowers, and coolers powered by on-site AC power.
The subcontractor will design and build a pilot-scale cement kiln system. The kiln will be a horizontal rotating shaft heated using natural gas, with drive motors, blowers, and coolers powered by on-site AC power. The system includes associated feed, cooling, grinding, and environmental control components. The work includes delivery of the equipment to the Flatirons Campus, commissioning, site acceptance testing, operator training, and the delivery of a final technical report.
We post new goods & materials opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""80402""Golden""CO""USA""PO BOX 4011""MAILSTOP RSF-041""NLR Request For Proposal No. AFQ-2027-00113.pdf"575380"file"".pdf""1""2026-11-25T18:33:39.952+00:00""bfe92662094b4f1197d46b8707545e08""public""0""public""093fd36cc7e84a4fae46cf4bb5acf220""0"10"0""Attachment 1 - Statement of Work.pdf"568946"file"".pdf""1""2026-11-25T18:33:39.952+00:00""362f7d322cf64310a26afff5eb2b1cd7""public""0""public""03a863c814fb48348442199e3d0a941a""0"9"0""Attachment 2 - Technical Specifications.pdf"780008"file"".pdf""1""2026-11-25T18:33:39.952+00:00""37edc550e10745d3b966acaabd1e40fb""public""0""public""334b98cc9b9246b39587fce9121d4239""0"8"0""Attachment 3 - Sample Subcontract Schedule - Firm Fixed Price.pdf"476588"file"".pdf""1""2026-11-25T18:33:39.952+00:00""37821bc1cc44489cb1836218a63e3969""public""0""public""76b7478f43214485a3c4ee6083ed55e2""0"4"0""Attachment 4 - Proposed Payment Schedule.xlsx"11658"file"".xlsx""1""2026-11-25T18:33:39.952+00:00""af38c302bce0479b9569b2c1b8fc303a""public""0""public""d5e76a3099754fbcb12f362d7ea0fe4c""0"2"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2aa93d0a65494a999e19bba9ed9e13e3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.