This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals.
The work includes;
Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.
Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.
Installation of 2 combination air-vacuum valves with utility boxes.
Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
The work includes installation of 4,475 linear feet of 4" HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source; covering an additional 1,150 linear feet of existing pipeline with imported fill from a government source; installation of 2 combination air-vacuum valves with utility boxes; installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services. The project also includes mobilization, removal and disposal of existing structures, project site preparation and grading, and installation of a utility locating system.
We post new plumbing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""84078""VERNAL""UT""USA""ASHLEY NATIONAL FOREST""355 N VERNAL AVENUE""Prebid Meeting for Ross Springs waterline Clarifications.docx"16341"file"".docx""1""2026-11-24T19:33:31.196+00:00""531dbba2347b4425b2926c7dec8340db""public""0""public""15d0d1140e07414a81bfe28ab1696d27""0"13"0""1240LT27Q0022.pdf"162454"file"".pdf""1""2026-11-10T22:18:48.259+00:00""8354ab58bc724b8aa90801a099ae9f07""public""0""public""89463eee9904470f8dad861a57d5db22""0"12"0""C04a SF-1442 1240LT27Q0022.pdf"124596"file"".pdf""1""2026-10-26T14:39:59.037+00:00""8420cc7523ec4892b0f55ea1dbc340a3""public""0""public""2f4b3f8f2c9f46778847a2db7a474d83""0"10"0""C04b 1240LT27Q0022.pdf"496138"file"".pdf""1""2026-11-03T14:33:47.359+00:00""eaacc1ed05264efbbe96712b84434567""public""0""public""7b62be1effda4e148186295e20a6857b""0"9"0""C04c SOW 1240LT27Q0022.docx"159084"file"".docx""1""2026-10-22T14:04:26.914+00:00""018d59abd2714adba74030de9b907e79""public""0""public""0f0704abe7e941daa3d3e288d92d7a9f""0"3"0""C04d Plans 1240LT27Q0022.pdf"6009165"file"".pdf""1""2026-10-22T14:04:26.914+00:00""c6d765daa7024498bbec832b68075d4d""public""0""public""0e0e1ba7790f433ba7ac8880d2111be8""0"2"0""C04e WD Daggett County Utah 1240LT27Q0022.pdf"50381"file"".pdf""1""2026-10-22T14:04:26.914+00:00""15391a95a340453abd508405f430ff56""public""0""public""f120f226031d4c8981e122578fa15009""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2a19be0173a54099b15b86941e804d55), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.