Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
Design-build replacement of the Building 1515 steam heating system with decentralized gas-fired hot water boilers, including design, specifications, material ordering, installation of boilers, pumps, piping, venting and controls, integration with native BACnet to the base EMCS, matching new capacity to existing steam heat exchanger capacity on the RBI Futera III baseline, with construction following the weather-dependent base steam shutoff.
We post new hvac opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"84056-5805""HILL AFB""UT""USA""CP 801 586 8482""6038 ASPEN AVE BLDG 1289""16292 Solicitation Boiler Replacement Amd 2.pdf"251336"file"".pdf""1""2026-11-02T18:44:00.954+00:00""e46c58fd4ed346749a5d8e21f48bcc69""public""0""public""9ade10300f094013915e3866f8c3ed92""0"50"0""RFI Responses 10-16-2026.docx"26663"file"".docx""1""2026-10-29T14:35:43.812+00:00""e101e76351964430a1808f0891ede814""public""0""public""337f2a86ea0c40eaafc5bb9ffe4caa3a""0"49"0""questions.docx"16048"file"".docx""1""2026-10-13T21:34:40.06+00:00""0a99dca68b044013b7c2a562e7f4bcda""public""0""public""2610492bf4684eee80fd49ba566f85ff""0"48"0""Phase 3 and 4 as-built electrical.pdf"21931281"file"".pdf""1""2026-10-13T21:34:40.06+00:00""c31206a1a5514a19873d2716a77707b4""public""0""public""d452467a6ef2466fbad0c21606bf10ef""0"47"0""Phase 2 - as-built electrical.pdf"21767132"file"".pdf""1""2026-10-13T21:34:40.06+00:00""56dc0d3c4d6840c19c303e752a8a8f9c""public""0""public""7cd28f359d9743e6b8641bd814b3990a""0"46"0""Phase 1 as-built electrical.pdf"1940162"file"".pdf""1""2026-10-13T21:34:40.06+00:00""c932fa347de84ebe928a4f564bfb4fca""public""0""public""ddc5754a2df44837bd257b2d44183c39""0"45"0""A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf"56908"file"".pdf""1""2026-09-29T20:46:47.845+00:00""2b97a98bdb334bb5a447ee852c794037""public""0""public""8d55c45d9f4d4afdb3b9abb1d193f56f""0"43"0""A005 - System Safety Program Plan DI-SAFT-81626.pdf"56947"file"".pdf""1""2026-09-29T20:46:47.845+00:00""6d95c17115fb4556b90ed2ea0af6a9d1""public""0""public""401fe7f3f7f04acfa44b241dd4ae0ec4""0"41"0""A004 - As Built Configuration List DI-SESS-81830.pdf"56907"file"".pdf""1""2026-09-29T20:46:47.845+00:00""dd0e80fd0e9343ddb5a1ad1819d695c6""public""0""public""7cdec0c4082b439daddb193d77ac9b8e""0"38"0""A006 - Accident-Incident Report DI-SAFT-81563.pdf"56875"file"".pdf""1""2026-09-29T20:46:47.845+00:00""080d538da27d42c2a409e9feb2642083""public""0""public""41bc286b5edb4badab30277bfb9ceeef""0"38"0""A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf"56926"file"".pdf""1""2026-09-29T20:46:47.845+00:00""31716ffaaa4e4e1a88010f92bbbd9cac""public""0""public""24a80761b69e44a8913f17b4ef88bca0""0"36"0""A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf"56892"file"".pdf""1""2026-09-29T20:46:47.845+00:00""6f288b12565d4efaa428873f00dc8e5f""public""0""public""c7b5282413f143928f075c41b182753e""0"34"0""Phase 2 as-built mechanical.pdf"16060509"file"".pdf""1""2026-09-29T16:35:12.28+00:00""d69358b2f1344dfcabb270fae27cc6c8""public""0""public""cc02002d1cab4193a07e6762c2fdefbe""0"32"0""Phase 1 as-built mechanical.pdf"2625127"file"".pdf""1""2026-09-29T16:35:12.28+00:00""3f9de63f608b43b19ca083591a5568ca""public""0""public""f4083fc61ad442fd84277b9efdc77c4d""0"30"0""Pages from FY06 FY07 As-Builts Vol 2.pdf"1895432"file"".pdf""1""2026-09-29T16:35:12.28+00:00""aabc726ed1004a1aa79f20b8300cb137""public""0""public""514cbffcd2db40879482b00f85733739""0"28"0""G14_Hill_AFB_IFS_Electrical.pdf"409456"file"".pdf""1""2026-09-29T16:35:12.28+00:00""3148d4e5aa774f659917ef7cd987e9cf""public""0""public""32ef643042524769b8e36b65d3c45eb6""0"26"0""G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf"212564"file"".pdf""1""2026-09-29T16:35:12.28+00:00""cb8bd2e525df4d85bb28e86186578588""public""0""public""806cadc04c2e4672a74239aeab0041e5""0"24"0""G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf"476643"file"".pdf""1""2026-09-29T16:35:12.28+00:00""c5839e74c6b34a75ae703e2c467fde96""public""0""public""62b9d1b3a7314b8c84ebb2431a035f55""0"22"0""B1515 phases 3 and 4 gas lines.png"305050"file"".png""1""2026-09-29T16:35:12.28+00:00""6a62f0b597d0491c95ac11fd96e60b93""public""0""public""cd9c94e3d19a49e0988789ab8ef62101""0"20"0""B1515 phase 2 gas line.png"259714"file"".png""1""2026-09-29T16:35:12.28+00:00""cf5a9045bf7a4b6c86788aedf532658a""public""0""public""38e9239795e64a6e966f1f257e5f2c3b""0"18"0""B1515 phase 1 gas line.png"177697"file"".png""1""2026-09-29T16:35:12.28+00:00""ebb9640239e749aebb26b3403fc3166d""public""0""public""5b518d86b5fc4c0fb29af26941e34140""0"16"0""3-inch gas line at B1515.png"1037554"file"".png""1""2026-09-29T16:35:12.28+00:00""38de3e92aecc4313aecdbdc0cf93de13""public""0""public""b0b060d23f454fdb8177ea6ffbd6d886""0"14"0""RFIs for Bldg 1515.xlsx"32842"file"".xlsx""1""2026-09-29T16:35:12.28+00:00""427bd56d72bb4b8db0159d52496f70bb""public""0""public""be56ade924ac4d91b8c02aa5119396ae""0"12"0""16292 Boiler Replacement SOW (9-4-26) Final.pdf"662219"file"".pdf""1""2026-09-29T16:35:12.28+00:00""7374adcdd5924ce1b6a0ee2716480334""public""0""public""cafb2cbfa5bc440f82b1c45ed9116dd1""0"10"0""Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf"297819"file"".pdf""1""2026-09-29T16:35:12.28+00:00""0879183637964317ab05b27e72eada40""public""0""public""6c939cd14a664278a2d0148b610172ec""0"8"0""16292_Wage Determinations.pdf"62669"file"".pdf""1""2026-09-29T16:35:12.28+00:00""de042dc459c445c795747813f147f2f0""public""0""public""a06304f7946342f499a6e8dbc55f4f26""0"5"0""16292 Solicitation Boiler Replacement Amd 1.pdf"293005"file"".pdf""1""2026-10-02T17:08:14.776+00:00""8dd2208b74774100be5095d3c6e65e6b""public""0""public""f363adf234574c0090cab1d3f9937b7c""0"4"0""16292 Solicitation Boiler Replacement.pdf"293767"file"".pdf""1""2026-09-29T16:35:12.28+00:00""9e7701ef6762485da0711b3527cc9ec0""public""0""public""08533e5ef2db4dceac0af42d3fbcc854""0"3"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 29cc07c9b6f74ecdb6fc3e1d3c7a8e2b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.