This requirement is for the cleaning, inspection, and repair of the Mud Mountain Dam Sewage Lagoon.
A site visit will be offered on 17 November 2026, see attachment for information and registration.
Please pay attention to: Section L, Section M, and FAR 52.228-13 in the solicitation.
19 November 2026: Amendment 0001 posted, Site Visit Attendees List posted
The contractor must clean the bottom portion of the lagoon by removing approximately 15 cubic yards of gravel blanket using a vacuum truck, inspect for leaks, repair any leaks found in the HDPE liner (including the boot around the inlet pipe), replace two broken schedule 80 PVC inlet pipes with fittings, clear the clogged outlet pipe, replace the chlorinator with a Sanuril model 100 or equivalent, and perform a series of tests including trial seam testing, vacuum box testing, air lance testing, and two controlled water-hold tests (24-hour duration each). All work must be complete within 45 calendar days of Notice to Proceed.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"98134-2329""SEATTLE""WA""USA""KO CONTRACTING DIVISION""4735 EAST MARGINAL WAY SOUTH""W912DW27QA0060001.pdf"3641249"file"".pdf""1""2026-11-19T19:47:07.619+00:00""4059dd4a9c3b4cb6b1c20deca42ae11a""public""0""public""cfea1b9a4c824ae2b261d54009166f72""0"18"0""Site Visit Attendees.pdf"32050"file"".pdf""1""2026-11-19T19:47:07.619+00:00""f4f0006240944ce189953199448c56c1""public""0""public""f932caad12c14da29c909ec8c85f8f06""0"17"0""W912DW26QA006.pdf"3774065"file"".pdf""1""2026-11-09T21:51:40.762+00:00""476911b713b44c1ab76660475b50f52d""public""0""public""20804e68d3d34c92b41f38f4434c0056""0"16"0""Price Schedule.pdf"38503"file"".pdf""1""2026-11-09T21:51:40.762+00:00""4a6ec06840e14dad80c56321cbb002d1""public""0""public""dfcad336480547c5af0993bdff6e469e""0"15"0""Reference b - As-Built Drawings - Sewage Lagoon Mud Mountain Dam Liner Replacement 2018NOV30.pdf"3292254"file"".pdf""1""2026-11-09T21:51:40.762+00:00""e97f561ee2af4debb585aeac91702322""public""0""public""c42ac3dc746b4f03a87a3858abe68a19""0"14"0""Reference a - As-Built Drawings - Sewage Treatment Facility Plan Profile and Sections Mud Mountain Dam 1974FEB19.pdf"1322303"file"".pdf""1""2026-11-09T21:51:40.762+00:00""0060347ef5f14927acee390fc7587465""public""0""public""c4ebc9cb3682471fbf523f75448e6cda""0"11"0""Site Visit - MMD Sewage Lagoon.pdf"40310"file"".pdf""1""2026-11-09T21:51:40.762+00:00""1d642a23cfae4db9be527534164f2cf4""public""0""public""d858b9d1289d43cf8a28cd260b35717c""0"8"0""SF-86 BLANK.pdf"125753"file"".pdf""1""2026-11-09T21:51:40.762+00:00""ef58af9c75f04e7b8e031be4217fa596""public""0""public""5235712b578342d99cf724e32cfa63d7""0"7"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2681a1d388bb44199570a2bb5ea52f7a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.