Replace Trench Drains at Syracuse VA Medical Center.
The Contractor shall furnish all materials, supplies, equipment, personnel and supervision for asbestos abatement in Building 3 3PT/Sleep Study at Montrose VA Medical Center, including pre-abatement activities, regulated area preparation with containment, negative pressure, HEPA filtration and decontamination facilities, removal, clean-up and disposal of approximately 2,300 square feet of floor and mastic including carpet and levelers and 100 linear feet of radiator panel insulation and heat shield, infection-control measures, protection of occupants, site restoration, and compliance with VA specifications, drawings, and all applicable Federal, State and local codes.
We post new waste management opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""Specs _ Traditional Asbestos Abatement.pdf"324378"file"".pdf""1""2026-10-30T20:49:12.72+00:00""9b6e8a020e2e4af2b28bdbb293b3ce96""public""0""public""65a200b26bce4ebc92c634851e60e211""0"7"0""Specs _ Project 620-26-206 _ General Requirements.pdf"180367"file"".pdf""1""2026-10-30T20:49:12.72+00:00""fc3be159c4b24c67b751798f07452ce3""public""0""public""ee73c6a5390849c5b360180fdc3f7cc6""0"6"0""Drawing MR-003-02-PTR-HA101.pdf"475515"file"".pdf""1""2026-10-30T20:49:12.72+00:00""5ad6fb14c2924caa89909df47e66f32a""public""0""public""9d9214b726ad4491ba8a6eb5d7029576""0"5"0""WAGE DETERMINATIONS.pdf"109158"file"".pdf""1""2026-10-30T20:49:12.72+00:00""773d83c9bac54b28ba0ab8d3f6608686""public""0""public""b41ca8fc68e94b5f9adbf0af84ad44be""0"4"0""VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx"16061"file"".docx""1""2026-10-30T20:49:12.72+00:00""d9c6e058a7d14a229d7d4ae6b93f69d3""public""0""public""2504174612e8430cba48eb0b1091b24c""0"3"0""FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx"16346"file"".docx""1""2026-10-30T20:49:12.72+00:00""0f48432e420d4b568d018a0a6f1e1e63""public""0""public""ab324436bef84ae1939b4de214a3b3d5""0"2"0""36C24227R0010_1.docx"119615"file"".docx""1""2026-10-30T20:49:12.72+00:00""f096744a4d2542f9b828d95d7dc91dd6""public""0""public""f379624be6f64df4be701afa657462e8""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 253785a4260a4697bc1d7b93a7f418b8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.