E.O. 14398; CA-RED BLUFF FISH FWO-GARAGE SHOP REPAIR
The contractor must provide all personnel, equipment, supplies, tools, materials, and supervision to repair the roof and vents of the garage/shop building, including removing and installing new fabricated roof-top attic vents and Zee flashing, replacing rubber pipe boot flashings, removing and replacing hip, rake, and ridge flashing with larger-diameter screws, and repairing a section where the hip meets the rake by removing and installing new wider rake flashing. The work must be performed within regular business hours and the site kept clean and safe throughout, with debris hauled away after each task.
We post new garage opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""22041""Falls Church""VA""USA""FWS, Construction A/E Team 3""5275 Leesburg Pike""Sol_140FC326Q0055.pdf"1076040"file"".pdf""1""2026-09-03T02:40:52.066+00:00""dba0de2291e94a6583d0b8811861608e""public""0""public""7a525c0b16d946fe941328f382bb3b6f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 22e30aed9f5546e0a736a9f2451c8d98), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.