Purchase Description (PD)
Position Turner for Large Hulls
Surface Support Division, B343 Shop
Red River Army Depot (RRAD)
Texarkana, TX 75507-5000
11 August 2026
1.0 Scope. This PD is to define the specifications necessary to award a contract for a 1 EA Position(Posi)-Turner: Model numbers – 10LS-250 or equal to, will be for the Directorate for Maintenance in the Welding Shop section, Bldg. 343 in support of the Bradley/MLRS fleet expansion effort. Contractor shall perform any/all site preparation needed for new equipment. Site preparation may include delivery of new equipment, offloading and positioning of new equipment, planning and designing, fabrication, and commissioning necessary to furnish one Posi-Turner to the Welding Shop.
2.0 Requirements.
The following salient characteristics are the minimum requirements for any proposed items being offered:
Capacity: 10,000 lbs.
Unit includes the "Leveler" that adjusts the center-of-gravity under the hook to balance the load with pushbutton control
Bail adjusts 6" +/- either side of center (bail = 4.3" x 7.5")
Maximum sling spacing: 251"
Minimum sling spacing: 14.25"
Heavy duty non-slip surface on drum
Heavy duty drive package
Power required: 460/3/60 (power to be supplied from crane)
Includes operator pendant with 20'-0 cord.
System to be used with a single crane/hoist hook
Estimated unit weight: 4765 lbs.
Estimated system height: 49" (base to hook)
Painted standard Caldwell yellow
Meets ASME B30.20, BTH-1 design standards; design category "B", service class "2".
3.0 Installation Schedule. The Posi-Turner shall be delivered, installed and operational at building 343, Red River Army Depot.
RRAD works a four-day, ten-hour workweek, Mon-Thurs, 0630-1700. Working Friday is not guaranteed but will be taken into consideration. The contractor may request to work Friday with 48 hours prior notice to RRAD POC. RRAD will be closed on all Federal Holidays which are:
New Year’s Day
Martin Luther King Birthday
President’s Day
Memorial Day
Juneteenth
Independence Day
Labor Day
Columbus Day
Veteran’s Day
Thanksgiving Day
Christmas Day
4.0 Final Acceptance Testing
A final acceptance run-off shall be performed. The runoff shall demonstrate the system’s ability to lift, roll over, and position 2 EA MLRS Hulls without failure. The test shall consist of the designed by RRAD personnel with no failures. Government will furnish the MLRS Hulls for the final acceptance testing
5.0 Technical Manuals
Technical Manuals and Parts List: Contractor shall provide two (2) hard copies and one electronic copy on CD/DVD of operations sequence, system program, Bill of Materials (BOM), wiring diagrams/schematics, maintenance manuals for contractor installed equipment including calibration information and procedures where applicable. all operator and maintenance manuals.
RESPONSIBILITIES
Government Contractor
() (XX) a. Furnish labor and material handling equipment for
off-loading and placing items on foundation.
() (XX) b. Set and level the machine components on its
foundation.
() (XX) c. Provide and install anchor bolts and nuts.
() (XX) d. Connect machine to the provided utilities hook-up.
() (XX) e. Provide all necessary materials, tools, gages and
instrumentation necessary to perform the required tests.
Material and tooling required for the performance testing at
Government facility.
() (XX) f. Provide and charge all systems with fluids in accordance with
manufacturer's instructions.
(XX) () g. Provide unobstructed utilities hook-up within 20 feet of
system.
The contractor shall furnish one Posi-Turner (Model 10LS-250 or equal) with a 10,000 lb capacity, Leveler, and ASME B30.20/BTH-1 compliance; perform site preparation including delivery, offloading, positioning, planning, designing, fabrication, and commissioning; provide two hard copies and one electronic copy of technical manuals; conduct a final acceptance run-off demonstrating the system's ability to lift, roll over, and position 2 EA MLRS Hulls without failure; and complete all responsibilities including furnishing labor, material handling equipment, setting and leveling machine components, providing anchor bolts, connecting to utilities, providing test materials/tools, and charging systems with fluids.
We post new equipment maintenance & rental opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"75507-5000""TEXARKANA""TX""USA""DIR FOR CONTRACTING KO""100 MAIN DRIVE BUILDING 431""Combo SOL Positurner 2.1.pdf"248657"file"".pdf""1""2026-09-10T19:29:58.855+00:00""f0b3aab2cf4747e4b890f1388e490db2""public""0""public""c65ea4c4032d4b4a967dcad5fc6f6b87""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 22514ee8b8d449789ac856e028cf9105), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.