The new White Sands Missile Range (WSMR) Information Systems Facility (ISF) requires installation of the VERTIV NetSure DC Power System, which serves as the foundational DC power infrastructure for the facility’s mission‑critical information systems. The NetSure platform is a modular, scalable –48 VDC power system composed of multiple bay configurations capable of supporting power requirements ranging from 1,000 amps to 16,000 amps. Bay options include compact combination bays, complementary distribution bays, and stand‑alone power bays, all of which integrate seamlessly with the facility’s AC electrical infrastructure.Pleas see the attachment for purchase description.THIS is a SUPPLY with Installation FFP
The contractor must mount and assemble (8) -48v strings of GNB Absolyte 3-100G29 batteries, install EEE battery disconnects, mount (4) NetSure 8200 Main Combo Bays and (2) Supplemental Combo Bays with associated PDSCs, run and terminate NetSure communication cable, install (46) eSure 200A rectifiers, mount four 8-load Non-Classified Room BDFBs and one 2-load Classified Room BDFB, and perform test and turn-up limited to the internal operation of the power plant. WSMR will receive and store equipment, handle movement on base, and be responsible for interconnecting all equipment for proper operation.
We post new goods & materials opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"76544-5025""FORT HOOD""TX""USA""36000 DARNALL LOOP""Question 19.docx"22799"file"".docx""1""2026-09-11T16:54:18.31+00:00""d9af7cc2f5384fd4addfad60e4b738bc""public""0""public""4fbd62554ef443bf86c10943d17fc9e7""0"10"0""Equipment Location.pdf"86371"file"".pdf""1""2026-09-11T16:54:18.31+00:00""0d4d266a3a50401fa0d8cfa6f1c882f2""public""0""public""1dda80662d5b47e4bd2ea9ea3296fe6c""0"9"0""Amendment 2 Solicitation - W9115126QA063.pdf"299126"file"".pdf""1""2026-08-26T17:54:24.271+00:00""77ccee9533ba4aa19bc44ee6dd997804""public""0""public""57ff499e6ea04b9485c37bb0b69ce29f""0"8"0""Drawing.docx"68375"file"".docx""1""2026-08-24T14:16:37.378+00:00""873a6a976b1e460fa57002778d358042""public""0""public""a1d835dc0d4c425f81a4077dfc9cff8b""0"7"0""SOW SPECS MUE ISF DC Power Plant 2nd Buy V2.docx"35381"file"".docx""1""2026-08-24T14:16:37.378+00:00""ddfd1a69f0b349e487ed2428e8679727""public""0""public""db17eadd9e014a638685d1e410a8a563""0"6"0""MICC Questions DC Power V2.docx"25236"file"".docx""1""2026-08-24T14:16:37.378+00:00""bc360e1269fc4fcdaa9adf63599f0dea""public""0""public""44e9830a01724418a9c9d8d72d362c83""0"5"0""Amendment 1 Solicitation - W9115126QA063.pdf"262903"file"".pdf""1""2026-08-24T14:16:37.378+00:00""8213b9c4171e45eea1fb6e0c6e3ecb6a""public""0""public""2f0acbc73461406f9a1771eea2acbcfd""0"4"0""Purchase Description.docx"39628"file"".docx""1""2026-08-10T14:43:10.75+00:00""a4e21dc554d54aa0aefcf9ff61bacf28""public""0""public""03f347d8d0da4222b03b17bb98192534""0"3"0""MFR_Limiting_Competition_MUE ISF DC Power Plant 2nd Buy_Redacted.pdf"1395762"file"".pdf""1""2026-08-10T14:43:10.75+00:00""26dc30134e51409db110fc9c39e63d49""public""0""public""9c66613a654a4ee9ae9f9a6265347b4b""0"2"0""Solicitation - W9115126QA063.pdf"261173"file"".pdf""1""2026-08-10T14:43:10.75+00:00""2599264d27684b068ec7763a167b1658""public""0""public""800ef70abe4f46d7a758ca79da47d3f7""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice ca2693eb581b4d789003b64e63c62b52), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.