Contractor shall provide all plant, labor, materials and equipment necessary to fully meet all
requirements of this Summary of Work, Construction Specifications, Construction Drawings and
all other Contract Documents related to and/or titled: JCN 1703883. QNA ARSR. Repair Building
and Exterior Items, Correct Water Damage and Prevent Water Intrusion, Morales (Hallettsville)
TX.
Project Identification: JCN 1703883 QNA ARSR Repair Building & Exterior Items, Correct Water
Damage, Prevent Water Intrusion, Morales TX.
a. Project Location: about 12 miles south of Hallettsville TX.
b. Access road through 2nd gate on left pass bridge off CR-12.
c. Coordinates are 29°20'28.71"N, 96°52'19.69"W or 29.341420, -96.871910
The contractor shall furnish all equipment, labor, materials, and tools to: (1) Power wash the entire building exterior including CMU walls, doors, soffits, fascia, concrete foundation, and cable trays at pressures of 1,200–3,500 psi depending on material; clean CMU walls and foundation by chemical, brush and rinse where discolored. (2) Reseal the entire ARSR building by removing old, dried, cracked or compromised sealant and replacing with new for all vertical control joints (8 joints: outside CMU and inside 5/8" fire retardant plywood), building-to-foundation joints, concrete door stoops, ductwork and pipe penetrations, soffits, frieze board to wall joints, and weatherhoods; use Sika WS-295 silicone sealant meeting ASTM C920; fill plywood panel joint vees with DAP 3 in 1 Premium Wood Filler and sand smooth; fill gypsum board joint vees with joint compound and mesh tape, then sand smooth. (3) Apply two coats of Foundation Armor SX5000 blended water-based silane/siloxane water repellent to all exterior CMU block wall surfaces and exposed concrete foundation after power washing and drying. (4) Replace all exterior door hardware with BHMA Grade 1 lever handles and lockset cylinders accepting universal 7-pin removable and interchangeable cores; provide panic hardware on Emergency Generator and Equipment Room doors; replace only the Equipment Room exterior doors (1 double door front, 1 single door back) and frames with 14 gauge steel label "B" fire-rated doors complying with FAA 1600.69D 4-3-13; coordinate and pay GSA-certified locksmith to remove and reinstall main entrance Equipment Room double door CDX-10 lock and Hoffman box. (5) Replace all damaged and mold/mildew-stained acoustical ceiling tiles maintaining 24" x 48" pattern; provide 6 extra tiles to COR; provide additional suspended ceiling framing or wires as needed; contain dust to protect ARSR equipment. (6) Replace all vinyl composition tiles (VCT) floor tiles and bases with Contractor Furnished Material (CFM) Armstrong Standard Excelon Imperial texture, 1/8" Fortress White 12" x 12" SKU 51839 except areas covered by equipment; cut tiles along edges where equipment remains; maintain 12" x 12" grid pattern and run texture all in same direction; replace all 4" resilient base where new VCT installed and elsewhere where accessible; provide temporary storage boxes (Conex boxes) for furniture during installation; clean flooring thoroughly and apply wax and buff. (7) Prime and apply two coats of interior white latex paint to all interior plywood and gypsum board walls and ceilings and interior CMU walls; paint exterior metal gable siding, roof edges, and vertical face of metal roof overhang matching existing color; paint soffit and metal siding above CMU walls matching existing color; paint all exterior single and double doors and frames inside and outside matching existing colors; sand cable trays medium, clean non-greasy and uncontaminated from salt and chemicals, and apply 3 coats of Rust Grip® per Section 0991 13.42 (second and third coats applied before first coat fully cures). (8) Replace two existing gable attic louver exhaust fans with Greenheck Sidewall Propeller Exhaust Fans Product #SE1-16-428-A5X-QD 1666-3373 CFM; install Greenheck wall housing product #H-16 for two 16-inch sidewall fans; install Johnson Controls Model P266ACA-100C fan speed control item 40G352 set to turn fans on when attic above 90°F and off when below 90°F; install two Greenheck weatherhood kits #WTHD-16-90 for 16-inch louvers and one #WTHD-18-90 for 18x18-inch gable louver, all 90-degree turn-down with galvanized steel and wire mesh birdscreen; replace round UPS room wall fan in kind with Greenheck CW-099A; seal exhaust fan exterior CMU wall penetrations. (9) Sand medium and clean steel pipe bollards (about 24, 6-inch pipe posts), apply primer and two coats exterior yellow paint, and provide new yellow high-density polyethylene ¼-inch heavy-duty bollard covers with 2 red 3/4" reflective stripes…
We post new exterior maintenance opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""73125""OKLAHOMA CITY""OK""USA""AAQ-700, MULTI-PURPOSE BLDG (MPB)""6500 S MACARTHUR BLVD""6973GH-27-R-00042.pdf"491184"file"".pdf""1""2026-11-20T20:30:24.016+00:00""2751bc1f4ebf46bdb5af170a3a2adb22""public""0""public""5f5d537b441647e5b4ff5bf214ce8b6b""0"8"0""6973GH-27-R-00042.pdf"455783"file"".pdf""1""2026-11-20T15:23:13.187+00:00""04d1afbc2e6b4c9da94b9ca628214038""public""2026-11-20T20:30:24.016+00:00""1""public""283158af762e4d58a34f73813a546a9f""0"7"0""2026-11-20T20:30:24.016+00:00""1703883 QNA ARSR Specifications Combined Repair Building Morales TX 2026 Sept 22.pdf"5369857"file"".pdf""1""2026-11-20T13:29:31.085+00:00""8d976b37415c472384f1a0cc5d3f8a04""public""0""public""22de31a182b048d2aa19c6f538d1237e""0"6"0""1703883 QNA ARSR Scope of Work Repair Building Morales TX 2026 Sept 22.pdf"95603"file"".pdf""1""2026-11-20T13:29:31.085+00:00""0d9c7e1b46984b8586ddbfd7bc2cd6f5""public""0""public""a680c7024b4a43f5810e20e7663138f0""0"5"0""1703883 QNA ARSR Amendment 1 Repair Building Morales TX 2026 Sept 22.pdf"123428"file"".pdf""1""2026-11-20T13:29:31.085+00:00""313ec4c31a094a0c9967534140834f47""public""0""public""aa2082ba961c405693041d5466b0caad""0"4"0""SECTION 01 01 11 Summary of Work QNA ARSR Morales TX 2026 September 22.pdf"125671"file"".pdf""1""2026-11-20T13:29:31.085+00:00""8907e0941000428aab8bed75dd2277d7""public""0""public""8646c332f9b34eb9a6d5f646c6783063""0"3"0""SECTION 08 71 00 Door Hardware with Schedule QNA ARSR 2026 Sept 22.pdf"169702"file"".pdf""1""2026-11-20T13:29:31.085+00:00""9bf08f6b6a7548599a9f4d8f3f34c9ae""public""0""public""e609964a6cc3450180deb0af9a875806""0"2"0""QNA ARSR DESIGN DRAWINGS JCN 1703883.pdf"5737025"file"".pdf""1""2026-11-20T13:29:31.085+00:00""e97cb733024b4c17a735b623ca94c1b4""public""0""public""50d10f791df34ef4b8c7e55db44767ff""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 210a898822e948e38b9f6bae4ac16113), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.