The Malcolm Randall VA Medical Center requires a one-time internal and external inspection of its 750,000-gallon water tower to satisfy the required five-year inspection cycle. Contractors are strongly encouraged to attend the site visit to evaluate site conditions and determine the resources, equipment, and personnel necessary to fulfill all requirements of this Statement of Work.
The Contractor shall provide all labor, materials, equipment, transportation, supervision, and incidentals necessary to perform a one-time five-year internal and external inspection, Water Tower Evaluation and Report, and Water Tower Washout and Disinfection in accordance with AWWA C652-11 for the 750,000-gallon water tower located at the Malcolm Randall VA Medical Center, 1601 SW Archer Road, Gainesville, FL 32608. All services shall be performed in accordance with the requirements of this Statement of Work.
The contractor shall perform a complete internal cleaning of the water tower, including washing all accessible interior surfaces and removing sediment, debris, and deposits. A comprehensive dry evaluation of the water tower interior, exterior, appurtenances, and visible foundation must be conducted, including an on-site assessment of the roof system, structural members, coatings, safety features, and sanitary conditions. The contractor shall access and evaluate water tower surfaces using rigging and rappelling techniques, perform visual inspection for corrosion, cracks, spalling, coating failure, ultrasonic thickness testing, inspection of roof systems, ladders, platforms, hatches, vents, safety devices, coating condition assessment including adhesion testing, and document all deficiencies. A certified engineering report documenting observations, deficiencies, and recommendations for rehabilitation, repair, and preventive maintenance shall be provided. The contractor shall also perform water tower washout and disinfection in accordance with AWWA C652-11.
We post new plumbing opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""33637""TAMPA""FL""USA""8875 HIDDEN RIVER PARKWAY""36C24827Q0132.pdf"619093"file"".pdf""1""2026-11-16T12:31:13.98+00:00""b588c61854cb4bb6aa7b36117f5fb6ef""public""2026-11-16T14:03:59.177+00:00""1""public""5d02407d88b74df884dca0a0d6b4925f""0"6"0""2026-11-16T14:03:59.177+00:00""36C24827Q0132.pdf"619046"file"".pdf""1""2026-11-16T14:03:59.177+00:00""fc3751ba5f654756bae77838d37dbfc8""public""0""public""ed4a19d35bd44d129e4fa7c2aaa7f926""0"4"0""36C24827Q0132_1.docx"15717"file"".docx""1""2026-11-16T12:31:13.98+00:00""fc0871e436e8485299d144ad122d7397""public""0""public""b6abb767927a41659fb071d0c1a64063""0"3"0""http://www.va.gov"0"link""1""2026-11-16T12:31:13.98+00:00""66f9d5cbe1f5454daea4a812c810792e""public""0""URL""public""d2872d56ceac4563b4d9c97fb44e4ecc""0"1"0"Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 208d6e8d9fae438ebe2f6946e505ba88), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.