We'll email you new general contractors opportunities in New York as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The RFx will be accessible through the PASSPort Public Portal: https://passport.cityofnewyork.us/page.aspx/en/rfp/request_browse_public Enter 85027P0001on the 'Keywords' field to search for the project. The New York City Department of Design and Construction (DDC), Division of Public Building, intends to enter into requirements contracts for the design and construction as described in the Request for Proposals (RFP). DDC is engaged in a major program to remove/upgrade/replace petroleum storage tanks in City facilities.
Through this RFP, DDC is seeking to engage four (4) construction management firms for the provision of all services necessary and required to ensure petroleum storage tanks compliance with all local, state and federal laws, rules, and regulations,including without limitation, compliance with all protocols required by the New York State Department of Environmental Conservation.
The scope of work consists of construction, construction management, and engineering design services for: (1) site evaluation, (2) tank system integrity inspection, and (3) removal, upgrading and/or replacement of petroleum product storage tanks and tank system components, including sumps, to ensure compliance with NYSDEC and EPA UST regulations and 2015 revisions and all local, state and federal laws, rules and requirements. The contractor will provide services on a task order basis for numerous sites assigned after contract award, including site investigation, design, construction, and construction management. The work is to be performed in the boroughs of Manhattan, Staten Island, Brooklyn, Queens, and the Bronx.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: NYC City Record (request 20261009021), retrieved via NYC Open Data. View the official posting, and always confirm requirements and deadlines with the issuing agency.