The procurement, delivery, installation, commissioning, acceptance testing, documentation, software, and training associated with two (2) metal laser powder bed fusion (L-PBF) additive manufacturing systems. One medium-scale system and one large-scale, tall-build system. The systems are intended to provide complementary build-volume capability and support a substantially common process-development, build-preparation, machine-control, and parameter-management workflow.
The seller shall furnish all labor, materials, equipment, software, documentation, supervision, and incidental items necessary to provide two production-capable metal L-PBF systems. The medium-scale system must have exactly two independently controlled lasers, a usable X and Y build dimension of 200-300 mm, a Z build dimension of 300-400 mm, a square build area, and a build plate temperature up to 500°C. The large-scale system must have exactly six independently controlled lasers, a usable X and Y build dimension of 400-500 mm, a Z build dimension of 1600-1800 mm, and a square build area. Both systems must include water-cooled optics, an inert process environment with oxygen monitoring and gas recirculation, coordinated multi-laser processing, beam-shaping capability from Gaussian to ring mode, machine monitoring with NIR camera, and a substantially common OEM software environment for build preparation, machine control, and parameter management. The seller must perform factory acceptance testing (FAT) before shipment and site acceptance testing (SAT) after installation, including qualification builds using Haynes 282 powder. The seller must also provide onsite training covering machine operation, powder handling, build preparation, and transfer of build files between systems.
We post new goods & materials opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""37831""Oak Ridge""TN""USA""Oak Ridge National Laboratory""PO Box 2008""Attachment A - Statement of Work - X209 Laser Powder Bed Fusion (L-PBF) Machines FY27 - Rev 1.pdf"260942"file"".pdf""1""2026-10-30T13:46:52.639+00:00""0db495987cd1470bb45b9d0bb917700a""public""0""public""7ed92225961c4111a2d6d51a71128ab0""0"14"0""RFP511373 - Amendment 2.pdf"252695"file"".pdf""1""2026-10-30T13:46:52.639+00:00""d2b1b7ba121a47d59b0ef63406593509""public""0""public""43f754ccffa84b0d9128789955f4abc4""0"13"0""Questions and Answers.pdf"144288"file"".pdf""1""2026-10-29T16:33:55.368+00:00""ad64435fb9ca41fcb71394924a11b4c2""public""0""public""cb4d591c0e444dd090179901666d82b4""0"12"0""Amendment 1.pdf"260562"file"".pdf""1""2026-10-29T16:33:55.368+00:00""5f818bd1d95c4f2aa0ec2d714694a39e""public""0""public""2d121d7a7be243edb756c76fa2ec9e35""0"11"0""Attachment A - Statement of Work - X209 Laser Powder Bed Fusion (L-PBF) Machines FY27.pdf"260857"file"".pdf""1""2026-10-21T15:45:13.776+00:00""111ad1e8723544889103a7ef06d0a75b""public""0""public""c91c5713bcae4ce6ac8e5dec749da8b9""0"10"0""Attachment B - Terms-Conditions-Fixed-Price-BSD-CS-2150-09.30.2026.pdf"469001"file"".pdf""1""2026-10-21T15:45:13.776+00:00""a03cf24556e5489fb66fb33509a3a8ca""public""0""public""4053cce279da4b8b95319b1f63b96d06""0"9"0""Attachment C - Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf"297899"file"".pdf""1""2026-10-21T15:45:13.776+00:00""27f198887b0f489c8e138470dda46aa1""public""0""public""2118c3f76a6d4a849ae1fcd968358714""0"8"0""Attachment D - Reps-and-Certs-Abbreviated - 2026.03.09.pdf"993893"file"".pdf""1""2026-10-21T15:45:13.776+00:00""5c895df3c79e41e096891053977d4409""public""0""public""efc7983353fe4912a3552ac5936cb36d""0"7"0""Attachment E - Fixed Price Subcontract - Draft.pdf"401652"file"".pdf""1""2026-10-21T15:45:13.776+00:00""f7bd62f5e1594ddcba8d662a7644aa9b""public""0""public""1ed4f60223e84be38f0d80477c9e6052""0"6"0""Attachment F - Representations Regarding Small Business Subcontracting Plan (BSD-CS-2125) - 10.01.2025.pdf"983195"file"".pdf""1""2026-10-21T15:45:13.776+00:00""9bfbfe2504414777919bd95b7b1f6870""public""0""public""d1c7050f43624842ba19d3c806b203fa""0"5"0""Attachment G - Certification-Exemption-from-SCLS-Certain-Services-BSD-CS-2049-08.20.2025.pdf"984878"file"".pdf""1""2026-10-21T15:45:13.776+00:00""a1fa227f33c342cb8fa2e346924425c1""public""0""public""a7c70780b1ad42349b892d380e4a14c9""0"4"0""Attachment H - BSD-CS-2290-C-SCRM-Questionnaire.pdf"194107"file"".pdf""1""2026-10-21T15:45:13.776+00:00""2fe8491ab9d2418399e5d7c9a1d3d014""public""0""public""f9c1422e731a41faa46b04cfcddfd9f1""0"3"0""Attachment I - Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf"1195592"file"".pdf""1""2026-10-21T15:45:13.776+00:00""f6f305db4d0c4a78aca68ca908d0b3b2""public""0""public""f44640e4975746528bf564cb971059db""0"2"0""RFP511373.pdf"321669"file"".pdf""1""2026-10-21T15:45:13.776+00:00""bdab1bc2922749559fe0f030cbadd4d9""public""0""public""f84a75fb38d94057a730a3b6113e7bc2""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 2011f7eb13244169936d6a551ac03f89), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.