PR 100022708
6150-01-685-8736
INDEFINITE QUANTITY
CABLE ASSEMBLY, POWER ELECTRICAL BRAN
QUANTITY: 531
END ITEM APPLICATION:
APPROVED SOURCES:
Elbit Systems of America – Night Vision; CAGE 13567; P/N 285923-2
Solicitation will be unrestricted.
DELIVERY:
FOB Origin; I/A Destination
Government Required Delivery schedule:
247 Days ARO
Pricing will be evaluated on the Estimated Annual Demand (EAD): 531 each
The Guaranteed Minimum will be cited in the solicitation.
There will be a 5-year base period without an option.
Stock delivery locations will be to any facility in the Continental United States as cited on each delivery.
IT IS NOT ESTIMATED THAT THE TOTAL VALUE WILL EXCEED THE TINA THRESHOLD. HOWEVER PLEASE BE PREPARED TO SUBMIT CERTIFIFIED COST/PRICING DATA WITH YOUR OFFER IF NECESSARY.
NUMBER NOTE 26 APPLIES
ELECTRONIC OFFERS ARE NOT ACCEPTABLE. OFFERORS MUST SUBMIT A COMPLETED SOLICITATION PACKAGE.
A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA DIBBS AT https//www.dibbs.bsm.mil. RFP ON THE ISSUE DATE CITED IN THE RFP. RFP'S ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT. THIS SOFTWARE IS AVAILABLE FREE AT http://www.adobe.com. A PAPER COPY OF THIS SOLICITATION WILL BE AVAILABLE TO REQUESTERS. THE SOLICITATION ISSUE DATE IS OR ABOUT NOVEMBER 16, 2026.
The contractor must supply 531 each of Cable Assembly, Power, Electrical Bran (NSN 6150-01-685-8736) per the approved source Elbit Systems of America – Night Vision (CAGE 13567, P/N 285923-2) or other approved sources, with delivery FOB Origin, I/A Destination, within 247 days ARO, under a 5-year base period without options. Stock delivery locations will be to any facility in the Continental United States as cited on each delivery.
We post new goods & materials opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23297""RICHMOND""VA""USA""ASC COMMODITIES DIVISION""8000 JEFFERSON DAVIS HIGHWAY"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1e9459ea662c4cec94d8c51b90e937df), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.