Final QUESTIN/ANSWERS Spreadsheet uploaded.
QUESTIONS/ANSWERS POSTED. Solicitation extended to 10 Nov 2026, 10am(CT).
Amendment 0001 - 1st paragraph page 1, changed quantity of 400 to 100 and 25 to 10.
Requirement - Helium Inspection Services.
Read all attachments.
Please make certain Cage Code is current.
The contractor shall perform certified non-destructive helium leak testing and inspection on 100 one-metric-ton containers. Tasks include installing a custom 3-inch NPT test plug, pressurizing each container to 15.0 PSIG ± 0.2 psi with an air-helium mixture of at least 50% helium, conducting pressure-hold tests (initial, 5-minute, and 30-minute readings with no drop ≥0.1 psi), and scanning all welds and seals with a calibrated leak detector capable of detecting leaks as small as 5E-6 std cm3/sec. A passing container must have a corrected helium leak rate less than 1.0E-5 std cm3/sec. The contractor must submit a detailed Leak Test Inspection Procedure before work, a final Leak Test Inspection Report listing all container serial numbers and pass/fail status, and a valid calibration certificate. The period of performance is 1 January 2027 through 31 December 2027, with testing to be performed on-site at TEAD Building 519 in a single coordinated campaign after Government assembly is complete.
We post new uncategorized opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-0000""ROCK ISLAND""IL""USA""ACC ROCK ISLAND BLDG 60""3055 RODMAN AVE""QUESTIONS - ANSWERS.xlsx"19565"file"".xlsx""1""2026-10-26T15:44:09.567+00:00""e1d96526c6864d018529f5ce447951d7""public""0""public""698fb72ae3f845b18cc35d9b3d657a90""0"7"0""QUESTIONS - ANSWERS.xlsx"18579"file"".xlsx""1""2026-10-26T12:14:21.065+00:00""a4e0338515fe4e73885e3056925daa76""public""2026-10-26T15:44:09.567+00:00""1""public""bd21430e9c87492e882faa49d57775ff""0"6"0""2026-10-26T15:44:09.567+00:00""B08 - Solicitation - Helium Inspection Services -- Amendment 0001 final.pdf"241524"file"".pdf""1""2026-10-14T16:14:47.84+00:00""6d31ff51da7d4f42bb894040cf320865""public""0""public""217ab92568674f81b045ef1450a7c0b4""0"5"0""B08 - Attachment 0003 - PWS - Helium Leak Inspection Service_final_8.25.2026.pdf"245273"file"".pdf""1""2026-10-14T13:14:11.352+00:00""adea89322de641cebb234c88b0b0f252""public""0""public""59566950c0ac451ba046080b03de8095""0"3"0""B08 - Attachment 0001 - Pricing Matrix.xlsx"13522"file"".xlsx""1""2026-10-14T13:14:11.352+00:00""639c8041a5f04168a8ea1dd0320977f0""public""0""public""83ebafcdc122479fa2d2d7ce50bb2b07""0"2"0""B08 - TEAD - Clauses_Final - Attachment 0002.pdf"260392"file"".pdf""1""2026-10-14T13:14:11.352+00:00""083c198a091740f0855cb4fec44e0215""public""0""public""4f23ae3f79b6485494379d158b130dcd""0"1"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1e649489a203429281bbd6af04b3e160), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.