The purpose of this project is to assist with the salvage of windthrown trees across the Pomeroy Ranger District. Processing, decking and piling blown-down material is necessary to help reduce potential insect and disease infestations, reduce hazardous fuel loading, and retain economic value of the wood material.
All questions are due in writing to Kevin.Flores@usda.gov, no later than 10:00AM PST on 17 November 2026
Amendment 1 posted on 09 November 2026. See attachments for details
Amendment 2 - Q&As posted on 18 November 2026. See attachments for details
The contractor provides all labor, equipment, tools, materials, supervision and transportation to process downed green material on and along specified Forest Service road prisms, cut logs greater than 8-inch DBH to 6-inch top DIB in 16-foot-6-inch or 33-foot lengths, stack logs in stable accessible decks at designated landings, pile brush no larger than 20-foot by 20-foot free of soil, follow OSHA logging safety standards, and provide daily progress reports and a final completion report with photographic documentation.
We post new lawn and landscaping opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""97205""PORTLAND""OR""USA""1220 SW 3RD AVE STE 310""1221 SW 3RD AVE STE 310""1240BK27R0001 Amendment 2 - Q and As.pdf"162117"file"".pdf""1""2026-11-18T21:03:21.966+00:00""d42e228cb7594d6c8da8b16f261d86b5""public""0""public""03906303996840d080cbfd49a5873d77""0"39"0""1240BK27R0001 Amendment 1.pdf"89069"file"".pdf""1""2026-11-09T20:19:38.024+00:00""0787d3d0e81f4057bc78770c9c3a5225""public""0""public""04670a2969304b29ada7580204014672""0"38"0""1. RFP 1240BK27R0001 - NZ Blowdown Cleanup.pdf"681272"file"".pdf""1""2026-11-09T20:19:38.024+00:00""259cc0aa6e434108a9f812f4f71d8818""public""0""public""3f46c6e9d5b948bdbf98f95cacdbccd0""0"37"0""Attachment 1_Performance Work Statement_NZ Blowdown.pdf"173133"file"".pdf""1""2026-11-05T21:59:39.531+00:00""ef550681bccb4321b2cee256aec16699""public""0""public""cb656fb720a6410e8d2788bde6a12c9c""0"35"0""Attachment 2_Map1_NZBlowdown.pdf"1135262"file"".pdf""1""2026-11-09T20:19:38.024+00:00""fa2b33dc2aae4f39ae4b30cda170978d""public""0""public""6a09333118cd477fa83d53b9aa1a89af""0"34"0""Attachment 3_Map2_NZBlowdown.pdf"1181859"file"".pdf""1""2026-11-09T20:19:38.024+00:00""8fb6a2ee3b9647379a45369d85fa1bdf""public""0""public""579a1c4500bd4e2da052fe03a9abea28""0"30"0""Attachment 4_SCA WD 2015-5559.pdf"4285871"file"".pdf""1""2026-11-09T20:19:38.024+00:00""56490c65ec094527b12fb53588d1112a""public""0""public""9a3cdf13cc1b499d8b6a9af9593b83a0""0"25"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1d99280157a64e269cd8a3959d1bffae), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.