The Contractor shall provide all labor, supervision, equipment, materials, tools, transportation, packaging, sampling, laboratory analysis, and disposal services necessary to remediate residual petroleum-impacted soil and remove fuel-contaminated wastewater at the 36th Logistics Readiness Squadron (LRS) Petroleum, Oils, and Lubricants (POL) Compound, Andersen Air Force Base (AFB), Guam. The work addresses contamination associated with a fuel release near Building 26200 / Pumphouse 1 Generator and the contents of the Product Recovery Tank at Pumphouse 1.
The objective is to excavate and remove fuel-impacted soils to achieve the applicable cleanup goals, properly package, transport, and dispose of all generated waste (soil and liquid), confirm attainment of cleanup standards through laboratory analysis, and restore the excavated area to match surrounding grade and pre-existing conditions. All work shall be performed in a manner that minimizes disruption to flight operations and base activities.
The contractor shall excavate, field-screen, package, transport, and dispose of up to 10 cubic yards of fuel-contaminated soil; remove, containerize, transport, and dispose of up to 1,500 gallons of fuel-mixed wastewater from the Product Recovery Tank; collect and analyze confirmation samples; and restore the excavated area to match surrounding grade and pre-existing conditions. All work must minimize disruption to flight operations and base activities.
We post new excavating opportunities in Guam as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"96543-4040""APO""AP""USA""UNIT 14040""FA524026Q0047- Solicitation.pdf"326343"file"".pdf""1""2026-09-09T01:03:54.585+00:00""cb1df38eca82478ba6885f1646a55511""public""0""public""6a42bd4ccaa24303a713aa7090cef32e""0"12"0""Attachment 1 - Statement of Work (SOW).pdf"163168"file"".pdf""1""2026-09-09T01:03:54.585+00:00""fbbfb6a961044ccc91a1a11bfad9753c""public""0""public""b3d0b23fc61f4c22b2d0ab92f6375f8d""0"11"0""Attachment 2 - Provisions and Clauses.pdf"19451"file"".pdf""1""2026-09-09T01:03:54.585+00:00""41a4880faccb45d3ba2ba2b43463d6fd""public""0""public""6b13ce0ae3ad4a15b928d8985f0fa62c""0"9"0""Attachment 3 - Wage Determination 2015-5693 Rev 29.pdf"99925"file"".pdf""1""2026-09-09T01:03:54.585+00:00""e9f9bbe8e0f744c2bf58c6fc8bf44e34""public""0""public""d7e5a77df7ea4759a7fd3c5714d33bab""0"7"0""Attachment 4 - Site Visit Instructions.pdf"118648"file"".pdf""1""2026-09-09T01:03:54.585+00:00""3e63ba1f4dcc4bbdbacf179012394cc8""public""0""public""abfecd49a0f14413a9e5b282adeca700""0"6"0"Most Guam work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 1d7e6caaba71461d9fd3035d7946ad63), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.