The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand.
Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
We post new excavating opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"36628-0001""MOBILE""AL""USA""KO CONTRACTING DIVISION""109 ST JOSEPH ST""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127826BA003¬iceType=SolicitationNotice"0"link""1""2026-09-11T16:40:54.318+00:00""598187bf74e54df381c4614deff9155a""public""0""PIEE Solicitation Module Link for W9127826BA003""public""a4bd997e4f6a44e1ac70eee20b9d86ec""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-09-11T16:40:54.318+00:00""0adca77fe54a41fd8c4fd2d9c0a3e3e6""public""0""Web Based Training for the PIEE Solicitation Module""public""fca80ec1491845eb8fbbf4d28886e504""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-09-11T16:40:54.318+00:00""d4b193cf3e7a43be9b5648f75a15b6cc""public""0""Registration Instructions for the PIEE Solicitation Module""public""f1406bd6786b411e852075768f486263""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-09-11T16:40:54.318+00:00""f3873fb97138425fa7ddd0bf287303e4""public""0""Department of Defense Procurement Toolbox""public""0c951c6812fa4e63b7c144abd04ebd69""0"1"0"Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice a92dbb4d14e64fbfb45cca059e20d6fa), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.