The Rock Island Arsenal has a requirement for the following item.
The Government intends to make a firm fixed price (FFP) award to the lowest priced, responsive, responsible vendor whose quote, conforms to the RFQ requirements and represents the lowest total evaluated price. Discussions are not anticipated.
Payment will be completed via Wide Area Work Flow (WAWF)
Quote must include shipping to Rock Island Arsenal, IL 61299
Site Visit is set for November 10th, 2026 at 10 AM Central Standard Time
Quotes are due by 6 PM, November 27, 2026
Certificate of Conformance in required
The contractor must furnish and deliver a complete, stationary, top-loading electric deep pit furnace meeting the detailed specifications in RIPD E4000-26-3-25. The furnace must have a work zone of at least 60 inches diameter by 144 inches depth, an operating range of 1500-1850°F, and be capable of holding 10,000-lb loads. The contractor is responsible for all labor, materials, and equipment for complete installation and set-up at the Rock Island Arsenal, including off-loading, placement, connection of utilities beyond the point of first connection, and providing any required foundation drawings. The contractor must perform on-site Temperature Uniformity Survey (TUS) and System Accuracy Test (SAT) per AMS 2750 for final acceptance. The contractor must also provide operator training (5 personnel), programmer training (2 personnel), maintenance training (2 personnel), and methods training (4 personnel). Additionally, the contractor must deliver various documentation including installation and preparation documentation, maintenance manuals, operator manuals, environmental compliance data, and a pre-shipment testing report.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-0000""ROCK ISLAND""IL""USA""ACC ROCK ISLAND BLDG 60""3055 RODMAN AVE""Solicitation Amendment W519TC27QA0190001 SF 30.pdf"4034899"file"".pdf""1""2026-11-05T19:22:41.954+00:00""d643524517f24f36afaa8887e0432be1""public""0""public""3bbe2dab238a4da7afa14262cdb36bba""0"6"0""Solicitation Amendment - W519TC27QA0190001.pdf"3366168"file"".pdf""1""2026-11-05T19:22:41.954+00:00""85ab620d4af14e8d851f3646e4d66e5f""public""0""public""ab4e0355df3f45ef9f25aa34fea460bd""0"5"0""Solicitation - W519TC27QA019.pdf"12357394"file"".pdf""1""2026-10-30T15:14:53.245+00:00""d921e884c9054410b6ffb279ffe300ad""public""2026-11-05T19:22:41.954+00:00""1""public""14afd7f0051845159e4f51e59673c45d""0"4"0""2026-11-05T19:22:41.954+00:00""RIPD E4000-26-3-25 Deep Pit Furnace.pdf"235654"file"".pdf""1""2026-10-27T20:12:20.077+00:00""25c138731192409d9c150c1b3191c041""public""0""public""584c242fc53442688f4ddaa9c859166f""0"2"0""26-3-25 CDRL.pdf"329682"file"".pdf""1""2026-10-27T20:12:20.077+00:00""a038472c43814181b19569d2eaa90de8""public""0""public""77379adb1eac492db3be589a118818a5""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1d76fb50ae3547c4a0b331728838e9d6), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.