Cripple Creek Veg Management Roads Reconstruction
CHUGACH NF
This project includes subgrade construction, unsuitable material excavation and
endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing
and grubbing,disposal site contouring, switchback realignment, waterbar construction
and reconstruction,and all other work required to get these roads to a condition to
place aggregate surface materials. Option item is road surfacing.
Questions Due:11/20
Proposals due: 12/04/2026 1700 PT
This project includes subgrade construction, unsuitable material excavation and endhaul, aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing, disposal site contouring, switchback realignment, waterbar construction and reconstruction, and all other work required to get these roads to a condition to place aggregate surface materials. An option item for road surfacing is included. The project is located on the Seward Ranger District, Chugach National Forest, near Hope, AK, accessible via the Seward Highway and Hope Highway. The performance period is estimated from December 18, 2026 to October 29, 2027.
We post new asphalt opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""972042829""Portland""OR""USA""1220 SW 3RD AVE STE 310""Attachment 3 Project Drawings CC Plans Full Set.pdf"1590802"file"".pdf""1""2026-11-10T17:41:35.346+00:00""f7dfe3f6aed24674a130188575efc21a""public""0""public""572b91acfc9946fd98b26910db539ce8""0"4"0""Attachment 4 Wage Determinations.pdf"487418"file"".pdf""1""2026-11-10T17:41:35.346+00:00""e6e5c63db945466eac5abd9d5a5a2945""public""0""public""c59dc41c069545c9968d317bf198acbe""0"3"0""Attachment 2 Project Specifications CC FSSS.pdf"563658"file"".pdf""1""2026-11-10T17:41:35.346+00:00""e4a383953d2f4a34ab8c0ca6ee222fbf""public""0""public""1fccf317b48749a8886a0936a1b9c477""0"2"0""Attachment 1 Project Specifications List.pdf"89960"file"".pdf""1""2026-11-10T17:41:35.346+00:00""fe9ed1ea60fe4766bb3c19da49719b19""public""0""public""3ce2adc50a5d4fd3b392270a5fd4bc14""0"2"0""1240BJ27Q0009.pdf"889723"file"".pdf""1""2026-11-10T17:41:35.346+00:00""0cbc0f05705044858315fbb5ff5226fd""public""0""public""475b3ea739fc49a5bb54e503293291bb""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1d54429818294c4c9bf3990120b20e6c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.