366 CONS is soliciting for quotes for one time services to re-activate the Snake River Water Pump used to feed water the Mountain Home Air Force Base.
Site Visit Information:
An optional site visit shall be offered to all interested parties on 20 November 2026 at 10 am MDT. If interested in attending please email the Contract Specialist and Contracting Officer to RSVP and receive additional information.
Questions and Answers:
All Questions will be due 23 November by 5 pm MDT. All questions must be emailed to both the Contract Specialist and Contracting Officer identified on this solicitation
The contractor shall furnish all management, licensed professional personnel, specialized labor, equipment, tools, testing apparatus, materials, transportation, and incidentals necessary to inspect, re-activate, test, and demonstrate the operational readiness of the State-constructed Snake River Water Transmission System (WTS) Intake Pump Station and associated 14.5-mile raw water transmission pipeline. The scope includes a pre-activation inspection and system verification, penstock flushing, mechanical and fluid system re-commissioning of raw water pumps, surge pressure vessel, air compressor system, high-pressure valves, and pipeline appurtenances, coordination with the Water Treatment Plant contractor, a 3.5-million-gallon continuous flow demonstration, and training and formal turnover to the 366th Civil Engineer Squadron Operations Flight.
We post new goods & materials opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"83648-5296""MOUNTAIN HOME AFB""ID""USA""CP 208 828 4658""366 GUNFIGHTER AVE STE 2102""Solicitation - FA489727Q0004.pdf"510611"file"".pdf""1""2026-11-09T22:28:49.19+00:00""85169822a9264cda9a7a0ec36dd15b85""public""0""public""1b86b7d115b5437ab9d95f58ff115bec""0"3"0""Wage Determination REV 31.pdf"4252152"file"".pdf""1""2026-11-09T22:28:49.19+00:00""4db635deb8b14d0fb4d8a4293d0449cf""public""0""public""7734660337e849ea82fb1442c713487a""0"2"0""STATEMENT OF WORK- Re-Activiation of Snake River Pump.pdf"368007"file"".pdf""1""2026-11-09T22:28:49.19+00:00""5193f17081c14fad8065018459bf4dca""public""0""public""0fc6b4508ec6404aa5b6c78fdf1ef7ed""0"1"0"Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1be2f54051d749f3b3104d953c98156d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.