The Contractor will provide modifications, repairs, construction, alterations and installations to the facilities, building and infrastructure components and systems on an on-demand basis site wide throughout Argonne National Laboratory (“ANL” or “Laboratory”), or other ANL directed sites within Will and DuPage Counties. The Contractor shall furnish all labor, materials, plant and equipment (except materials or equipment that may be specified to be furnished by Argonne National Laboratory) necessary to perform all work.
BOX document link:
https://anl.box.com/s/5ybz3jnv1pbowh2cs2n6fwemaz2zhqq7
This link is password protected. To obtain the password please email the Procurement Official Nick Hitzler (nhitzler@anl.gov) for access.
Provide modifications, repairs, construction, alterations and installations to facilities, building and infrastructure components and systems on an on-demand basis site wide, including architectural, civil, structural, mechanical, plumbing and electrical work performed on a per Task Order basis, furnishing all labor, materials, plant and equipment, supplies, transportation, qualified supervision and incidentals necessary to perform General Contractor services.
We post new general contractors opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60439""Lemont""IL""USA""9700 S. Cass Ave""Addendum No. 1.pdf"250056"file"".pdf""1""2026-11-03T16:45:46.707+00:00""e039bbd3352d4fe1819a04b3f59d0b30""public""0""public""4cf87dc0aa564d17975b367bf6d607c2""0"2"0""RFP 7-B164-P-00002-00 (RR GC BPA).pdf"272420"file"".pdf""1""2026-10-14T14:34:00.958+00:00""86fc2ff6cf9c4ccd81e36c305599810e""public""0""public""405918a53acf4b7ebb9fca87d1454d8f""0"1"0""https://anl.box.com/s/5ybz3jnv1pbowh2cs2n6fwemaz2zhqq7""BOX link for RFP file access"0"link""1""2026-10-14T14:34:00.958+00:00""8640ea95571e434b8a4400539b9a87e9""public""0""BOX link for RFP file access""public""28dbfb0b3d6a496195d2eb3e2811d0bd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 193931c0656240478151144abe626ddf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.