11/05/2026 - Amendment 0002 is issued to reflect the following:
Extend the due date to December 11, 2026.
Replace Statement of Work, see "Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002."
Updated Request for Proposal (RFP), see changes highlighted in yellow, "2031ZA26R00027 Revision 01 11052026."
Updated - "Attachment 4 - Pricing Table Revision 01 Amendment 0002."
Include attachments 8, 10,11,12 and 14-32.
10/08/2026 - Amendment 0001 is issued to extend the due date to November 9, 2026 to allow the government time to update the Statement of Work (SOW) and obtain authorization to include drawings and pictures. (See attached 2031ZA26R00027 0001).
09/16/2026 - See Request for Proposal with attachments.
The project requires survey, design, demolition, disposal and replacement of four two-cell Evapco cooling towers and one two-cell Baltimore Air Coil cooling tower, condenser water pumps and motors, piping and insulation, chemical feed, electrical distribution, fire and smoke detection, and HVAC controls integrated with the existing SCADA system, plus replacement of the corroded structural steel platform and the chiller/power plant wing roof with a code-compliant watertight system, including submittals, commissioning, as-built drawings, manuals and training while the facility remains operational.
We post new roofing opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20228""WASHINGTON""DC""USA""14TH&C STREET, SW""2031ZA26R00027 0002.pdf"211179"file"".pdf""1""2026-11-05T19:26:23.927+00:00""fecfb9fae40f492f818732a4615c3af6""public""0""public""8f3ff550a0a5424da38595917aa72cd4""0"214"0""2031ZA26R00027 Revision 01 11052026.pdf"1155966"file"".pdf""1""2026-11-05T19:26:23.927+00:00""b580b94ee68d412bb2240d72f741702c""public""0""public""d1bcd859fa024ff49d2ac889de127a64""0"213"0""Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf"989841"file"".pdf""1""2026-11-05T19:26:23.927+00:00""1f38e40c5cb34de5aec053e83ec0f316""public""0""public""ac9edc7bf0d0413d8b83ca7fc19cd0fb""0"212"0""Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf"139660"file"".pdf""1""2026-11-05T19:26:23.927+00:00""8e64d13635874d04a586ad346b68a618""public""0""public""a69f26cb4aae47f0a483a3b16ba322a3""0"201"0""Attachment 8 - Site Visit Sign In Sheet.pdf"371521"file"".pdf""1""2026-11-05T19:26:23.927+00:00""3742914ef09d44b28344e442489edc7b""public""0""public""3aee55493ae1494ba71f52d05136e701""0"195"0""Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf"4228815"file"".pdf""1""2026-11-05T19:26:23.927+00:00""0eadacca514f4aa3a6cf06e95ac10155""public""0""public""ababfd63539c4de0af90c4f689ccfdff""0"190"0""Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf"2881441"file"".pdf""1""2026-11-05T19:26:23.927+00:00""32ea2ae27efa4b6aa09f68753c5d0c18""public""0""public""ce7b7e1c967a4b64adcf5f865ee2db00""0"178"0""Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf"3005557"file"".pdf""1""2026-11-05T19:26:23.927+00:00""b4809afe4d8e493bb14f2e155a807671""public""0""public""c6a7e4a35ef948bba5bf06794e0be2a6""0"173"0""Attachment 14 Evapco performance data.pdf"589824"file"".pdf""1""2026-11-05T19:26:23.927+00:00""2d3896e1a7b3462fa3e3c3d85fccd483""public""0""public""e69d21f65110459699d83bb516d8ae5a""0"162"0""Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf"644344"file"".pdf""1""2026-11-05T19:26:23.927+00:00""db6ada92b9e34e1093afbc5b15c164f7""public""0""public""f0b7e497726d4c598bbe897306a7097b""0"157"0""Attachment 16 M03-vfd plan-BEPVFD.pdf"138613"file"".pdf""1""2026-11-05T19:26:23.927+00:00""0514be9bd2174a33b7b1f35b34e51220""public""0""public""82968208c8484165926cbeccb9e83201""0"151"0""Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf"1786558"file"".pdf""1""2026-11-05T19:26:23.927+00:00""638e42aaca324b2ba2627a60bc6a7932""public""0""public""84a33099dcd9480498b755c1e901da23""0"146"0""Attachment 18 Plate and Frame HX Information.pdf"385428"file"".pdf""1""2026-11-05T19:26:23.927+00:00""2e66c6d019334fd1ac00992b8e9ee342""public""0""public""429aa9daf5c342d8bc1239944eded1bd""0"123"0""Attachment 19 Structural Support for VFDs.pdf"366843"file"".pdf""1""2026-11-05T19:26:23.927+00:00""4c245a0f8205468fb3e91596cdef7a24""public""0""public""535a74adf0bc4a51b3ccce02f93ff435""0"119"0""Attachment 20 Tower_submittal.pdf"118654"file"".pdf""1""2026-11-05T19:26:23.927+00:00""86651e14732947139e9fe90a20d45b6f""public""0""public""75bea8c1fc6648308313ad306365ed8a""0"115"0""Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf"92502"file"".pdf""1""2026-11-05T19:26:23.927+00:00""5995e85ef35a46328022a2e019813d8a""public""0""public""8aa562bb2cef4f558a20dadf6e3b6501""0"111"0""Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf"92502"file"".pdf""1""2026-11-05T19:26:23.927+00:00""92958bad9f7d473bbed99a2855ab0bfa""public""0""public""cb4d14679bee44bebaae168cd3393469""0"107"0""Attachment 23 BEP-M1R613 w chiller Layout1.pdf"137080"file"".pdf""1""2026-11-05T19:26:23.927+00:00""f349a4a2fb654039b76acf2c9dae4759""public""0""public""3dde200b73684197bfc483214376da68""0"103"0""Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf"763825"file"".pdf""1""2026-11-05T19:26:23.927+00:00""a747f82138e9471587716ac229146548""public""0""public""390794e0f85e43428cdf31a1eb6adde5""0"99"0""Attachment 25 ax-dcm-06 Main Roof Top.pdf"99741"file"".pdf""1""2026-11-05T19:26:23.927+00:00""6b88ae48feae4855a6e63b220218eb08""public""0""public""05d1e75748e442d49813db3efc137717""0"76"0""Attachment 26 M-DCA-09-1001023-HV.pdf"209303"file"".pdf""1""2026-11-05T19:26:23.927+00:00""d71aef4e310a4291b420c3d0512b5884""public""0""public""7c291efd2c8048c3a2af68ba47db2b92""0"72"0""Attachment 27 ax-dca-09 Annex Roof Top.pdf"99741"file"".pdf""1""2026-11-05T19:26:23.927+00:00""8f89db12612544988ebeb869d68848a4""public""0""public""6e768186200c4f2497ee9ed2ebc5ff61""0"62"0""Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf"144173"file"".pdf""1""2026-11-05T19:26:23.927+00:00""2332392516514923b0dc9e13a204da3c""public""0""public""06ad215e8c524c10922c0b9ec89eb094""0"58"0""Attachment 29 Chiller Plan Upgrade M-1_recover.pdf"119322"file"".pdf""1""2026-11-05T19:26:23.927+00:00""1567be1a75e74325a11c856ea8fd8010""public""0""public""a0e7f329b2bd47659daf95068746bf05""0"54"0""Attachment 30 Pictures.pdf"41329139"file"".pdf""1""2026-11-05T19:26:23.927+00:00""cf85188446b642ee99337f2b89ccb2d6""public""0""public""ec6d4f02b9fd46119093679c184f0a2e""0"25"0""Attachment 31 Pictures.pdf"41335698"file"".pdf""1""2026-11-05T19:26:23.927+00:00""5ee6317897ab464a9ba35d3936d60b5a""public""0""public""641988d0c3d542c3a3e0deb70057ea6c""0"23"0""Attachment 32 Pictures.pdf"56381321"file"".pdf""1""2026-11-05T19:26:23.927+00:00""a13af572679c4ac4ac8d88cda3834dce""public""0""public""3d34f0f80a1c456b9d4124e3fdb67f6d""0"18"0""2031ZA26R00027 0001.pdf"620268"file"".pdf""1""2026-10-08T18:41:38.504+00:00""8d3a41c0af8f4dfe885184d6e8b57efd""public""0""public""a970a6e393b844e48d4a389c832a6bc0""0"17"0""2031ZA26R00027.pdf"1680242"file"".pdf""1""2026-09-16T19:43:34.792+00:00""57a82b4f138748eeae2d39de43fe8cef""public""0""public""6736e140174d4425b6a5bf90137f5093""0"16"0""Attachment 1 - Past Performance Questionnaire.pdf"418472"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8744f8ae3db64f9c9020dd57553a3afe""public""0""public""55eb365a2c0b4d66a9b17b77d52abbb6""0"14"0""Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf"3539790"file"".pdf""1""2026-09-16T19:43:34.792+00:00""744890ad6fd646cb993dc8e9211a0c14""public""0""public""5924d1b313094d12af2fa5d32fc17b31""0"13"0""Attachment 3 - Statement of Work - Cooling Towers.pdf"890407"file"".pdf""1""2026-09-16T19:43:34.792+00:00""56ba35c49e23415d803abea7f2405b53""public""0""public""fb0b663bf94447b297160decb559fc4b""0"11"0""Attachment 4 - Pricing Table.pdf"256018"file"".pdf""1""2026-09-16T19:43:34.792+00:00""2e310a832ac642d69f1266a362cfb2d2""public""0""public""2498a3db64a94f10bcb290db405cf98f""0"10"0""Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf"1158966"file"".pdf""1""2026-09-16T19:43:34.792+00:00""3892fdfa87844141a979f31a09c63df4""public""0""public""cb527084676049c39873b4f8cc0ade8a""0"9"0""Attachment 6 - Initial Staffing Plan.pdf"70534"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8cd49c8c2ed04704b64314df4950765d""public""0""public""643bb0a6c0ac48ebb0dfed88a1d50671""0"3"0""Attachment 7 - Monthly Workforce Report.pdf"75844"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8f8629ee63c54ba09f576e5e7c3fd870""public""0""public""af1843ad7f504c2ca0617ffcf8df1c67""0"2"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1511422418e848f896a0010668d90da1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.